RERA: A51800043517

THE GREENS

by SAI SHRADHA DEVELOPER Partnership
Certificate SignedP52000047594

Project Information

RERA Certificate No.
P52000047594
Registration No.
REA52000121461
Registration Date
2024-08-20
Developer
SAI SHRADHA DEVELOPER Partnership
Project Bank
DCB BANK LIMITED
Proposed Possession
2028-10-30
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Units Sold
0
Buildings
1
Project Area
9940.00 sq.m
Total FSI
16957.63
Approved FSI
16957.63
MahaRERA QR
THE GREENS
MahaRERA — P52000047594
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors16
Sanctioned16
🏗️Proposed Floors15
Sanctioned15
🚗Open Parking80
🅿️Closed Parking1
📅Completion2028-10-30
🏗️Proposed Floors15
Sanctioned15
🏗️Proposed Floors1
Sanctioned1

Apartment Configurations

Aster

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK30.0101
0%
1 BHK30.236101
0%
1 BHK30.748101
0%
1 BHK36.909101
0%
2 BHK45.23112012
0%
2 BHK47.307202
0%
Shop17.976101
0%
Shop18.37101
0%
Shop19.739101
0%
Shop19.745101
0%
Shop20.177101
0%
Shop32.693101
0%
Shop33.072101
0%
Shop33.735101
0%

None

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1Bhk29.100000381469727000
0%
1Bhk29.739999771118164000
0%
1Bhk31.610000610351562000
0%
1Bhk31.649999618530273000
0%
1Bhk32.79999923706055000
0%
1Bhk32.91999816894531000
0%
1Bhk33.04999923706055000
0%
1Bhk35.86000061035156000
0%
1Bhk36.02000045776367000
0%
1Bhk38.06999969482422000
0%
2Bhk41.970001220703125000
0%
2Bhk42.18000030517578000
0%
2Bhk52.06999969482422000
0%
2Bhk52.09000015258789000
0%
2Bhk53.06999969482422000
0%
2Bhk59.45000076293945000
0%
Na000
0%
Office Space36.5000
0%
Office Space59.2400016784668000
0%
Office Space59.36000061035156000
0%
Shop13.609999656677246000
0%
Shop13.90999984741211000
0%
Shop14.970000267028809000
0%
Shop15.789999961853027000
0%
Shop24.920000076293945000
0%
Shop25.209999084472656000
0%
Shop25.719999313354492000
0%

Construction Progress

ASTER

Basement (if any)70%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises15%
Plinth70%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises40%
Slabs of Super Structure95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
Stilt Floor 50%

AZALEA

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 0%

IRIS

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 0%

ORCHID

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 0%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.