📞 +91 98200 30685 ✉️
RERA: A51800043517

Gundecha Woods Phase 1

by GundechaConstructionPvtLtd Company
Certificate Signed P99000003314
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P99000003314
Registration No.
REA99000010305
Registration Date
2017-08-05
Developer
GundechaConstructionPvtLtd Company
Architect
Yogesh K Mhatre
Project Bank
ICICI BANK LIMITED
Proposed Possession
2018-05-31
Revised Possession
2018-05-31
Extended Possession
2019-05-31
Units Sold
0
Buildings
14
Project Area
12126.50 sq.m
Total FSI
14502.71
Approved FSI
12102.43
MahaRERA QR
Gundecha Woods Phase 1
MahaRERA — P99000003314
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors6
Sanctioned6
🅿️Closed Parking1
📅Completion1900-01-01
🏗️Proposed Floors6
Sanctioned6
🅿️Closed Parking1
📅Completion2018-05-31
🏗️Proposed Floors6
Sanctioned6
🅿️Closed Parking1
📅Completion1900-01-01
🏗️Proposed Floors6
Sanctioned6
🅿️Closed Parking1
📅Completion2019-05-31
🏗️Proposed Floors6
Sanctioned6
🅿️Closed Parking1
📅Completion2018-05-31
🏗️Proposed Floors6
Sanctioned6
🅿️Closed Parking1
📅Completion2018-05-31
🏗️Proposed Floors6
Sanctioned6
🅿️Closed Parking1
📅Completion2018-05-31
🏗️Proposed Floors6
Sanctioned6
🅿️Closed Parking1
📅Completion1900-01-01
🏗️Proposed Floors6
Sanctioned6
🅿️Closed Parking1
📅Completion2018-05-31
🏗️Proposed Floors6
Sanctioned6
🅿️Closed Parking1
📅Completion2018-05-31
🏗️Proposed Floors6
Sanctioned6
🅿️Closed Parking1
📅Completion2019-05-31
🏗️Proposed Floors6
Sanctioned6
🅿️Closed Parking1
📅Completion2019-05-31
🏗️Proposed Floors6
Sanctioned6
🅿️Closed Parking1
📅Completion2018-05-31
🏗️Proposed Floors6
Sanctioned6
🅿️Closed Parking1
📅Completion2018-05-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1 Bhk 29.68000030517578 0 0 0
0%
1 Bhk 89.04000091552734 0 0 0
0%
1 Bhk 97.52999877929688 0 0 0
0%
1 Bhk 147.9199981689453 0 0 0
0%
1 Bhk 162.5500030517578 0 0 0
0%
1 Bhk 177.60000610351562 0 0 0
0%
1 Bhk 552.6699829101562 0 0 0
0%
1 Bhk 617.6900024414062 0 0 0
0%
1 Rk 86.55999755859375 0 0 0
0%
1 Rk 103.44999694824219 0 0 0
0%
1 Rk 238.0399932861328 0 0 0
0%
1Bhk 59.36000061035156 0 0 0
0%
1Bhk 65.0199966430664 0 0 0
0%
1Bhk 97.52999877929688 0 0 0
0%
1Bhk 118.72000122070312 0 0 0
0%
1Bhk 148.39999389648438 0 0 0
0%
1Bhk 162.5500030517578 0 0 0
0%
1Bhk 177.60000610351562 0 0 0
0%
1Bhk 266.3999938964844 0 0 0
0%
1Bhk 296.0799865722656 0 0 0
0%
1Bhk 296.79998779296875 0 0 0
0%
1Bhk 325.1000061035156 0 0 0
0%
1Bhk 487.6499938964844 0 0 0
0%
1Bhk 520.1599731445312 0 0 0
0%
1Rk 20.690000534057617 0 0 0
0%
1Rk 41.380001068115234 0 0 0
0%
1Rk 43.279998779296875 0 0 0
0%
1Rk 129.83999633789062 0 0 0
0%
1Rk 151.47999572753906 0 0 0
0%
2 Bhk 46.619998931884766 0 0 0
0%
2 Bhk 48.4900016784668 0 0 0
0%
2 Bhk 145.47000122070312 0 0 0
0%
2 Bhk 193.9600067138672 0 0 0
0%
2Bhk 46.619998931884766 0 0 0
0%
2Bhk 145.47000122070312 0 0 0
0%
2Bhk 193.9600067138672 0 0 0
0%
2Bhk 436.4100036621094 0 0 0
0%
Shop 11.149999618530273 0 0 0
0%
Shop 16.360000610351562 0 0 0
0%
Shop 21.829999923706055 0 0 0
0%
Shop 46.0 0 0 0
0%
Shop 48.04999923706055 0 0 0
0%
Shop 66.76000213623047 0 0 0
0%
Shop 85.48999786376953 0 0 0
0%
Shop 87.87999725341797 0 0 0
0%
Shop 88.19999694824219 0 0 0
0%
Shop 88.69999694824219 0 0 0
0%
Shop 90.80999755859375 0 0 0
0%
Shop 101.7699966430664 0 0 0
0%

Fern A

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 162.55 5 5 0
100%
2 BHK 46.62 1 0 1
0%

Fern B

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 59.36 2 2 0
100%
1 BHK 520.16 16 16 0
100%
2 BHK 46.62 1 1 0
100%
2 BHK 145.47 3 3 0
100%
SHOP 16.36 1 0 1
0%
SHOP 85.49 6 6 0
100%

Fern C

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 59.36 2 1 1
50%
1 BHK 325.1 10 10 0
100%
2 BHK 46.62 1 0 1
0%
2 BHK 436.41 9 9 0
100%
SHOP 46.0 4 4 0
100%
SHOP 48.05 3 0 3
0%

Gulmohar A

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 162.55 5 5 0
100%
1 BHK 177.6 6 3 3
50%
2 BHK 145.47 3 3 0
100%

Gulmohar B

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 29.68 1 1 0
100%
1 BHK 617.69 19 19 0
100%
2 BHK 193.96 4 4 0
100%
SHOP 21.83 2 2 0
100%
SHOP 87.88 5 0 5
0%

Gulmohar C

Type Carpet (sq.ft) Total Booked Available Status
1 RK 103.45 5 5 0
100%
1 RK 238.04 11 11 0
100%
SHOP 66.76 4 0 4
0%

Gulmohar D

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 89.04 3 3 0
100%
1 BHK 552.67 17 17 0
100%
2 BHK 46.62 1 1 0
100%
2 BHK 145.47 3 3 0
100%
SHOP 21.83 2 2 0
100%
SHOP 87.88 5 0 5
0%

Gulmohar E

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 147.92 5 0 5
0%
1 BHK 162.55 5 5 0
100%
2 BHK 46.62 1 0 1
0%
2 BHK 48.49 1 1 0
100%

Palm A

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 148.4 5 5 0
100%
1 BHK 487.65 15 15 0
100%
2 BHK 193.96 4 3 1
75%
SHOP 101.77 7 1 6
14%

Palm B

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 97.53 3 3 0
100%
1 BHK 266.4 9 9 0
100%
1RK 20.69 1 1 0
100%
1RK 151.48 7 7 0
100%
2 BHK 193.96 4 4 0
100%
SHOP 88.2 6 1 5
17%

Palm C

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 118.72 4 2 2
50%
1 BHK 162.55 5 5 0
100%
1RK 41.38 2 2 0
100%
1RK 43.28 2 2 0
100%
2 BHK 145.47 3 3 0
100%

Pine A

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 97.53 3 3 0
100%
1 BHK 177.6 6 1 5
17%
1 RK 86.56 4 4 0
100%
2 BHK 145.47 3 3 0
100%

Pine B

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 65.02 2 2 0
100%
1 BHK 296.08 10 8 2
80%
1RK 41.38 2 2 0
100%
1RK 129.84 6 6 0
100%
2 BHK 193.96 4 4 0
100%
SHOP 88.7 6 0 6
0%

Pine C

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 296.8 10 8 2
80%
1 BHK 325.1 10 10 0
100%
2 BHK 46.62 1 1 0
100%
2 BHK 145.47 3 3 0
100%
SHOP 11.15 1 1 0
100%
SHOP 90.81 6 1 5
17%

Construction Progress

FERN A

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

FERN B

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

FERN C

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

GULMOHAR A

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

GULMOHAR B

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

GULMOHAR C

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

GULMOHAR D

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

GULMOHAR E

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

PALM A

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

PALM B

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

PALM C

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

PINE A

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

PINE B

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

PINE C

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

RERA Registered Amenities

Aggregate area of recreational Open Space 100%
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station 100%
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting 100%
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP) 100%
Solid Waste Management And Disposal 100%
Storm Water Drains 100%
Street Lighting 100%
Treatment And Disposal Of Sewage And Sullage Water 100%
Water Conservation, Rain water Harvesting 100%
Water Supply 100%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.