📞 +91 98200 30685 ✉️
RERA: A51800043517

Hill Spring Phase 1

by Velocity Partnership
Certificate Signed P51700009218
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700009218
Registration No.
REA51700018167
Registration Date
2017-08-22
Developer
Velocity Partnership
Architect
Sakaar Architects
Project Bank
HDFC BANK
Proposed Possession
2018-06-30
Revised Possession
2018-06-30
Extended Possession
1900-01-01
Units Sold
0
Buildings
3
Project Area
2250.00 sq.m
Total FSI
11684.00
Approved FSI
11684.00
MahaRERA QR
Hill Spring Phase 1
MahaRERA — P51700009218
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors29
Sanctioned29
📅Completion2018-06-30
🏗️Proposed Floors29
Sanctioned29
📅Completion2018-06-30
🏗️Proposed Floors2
Sanctioned2
📅Completion2018-06-30

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1 Bhk 34.84000015258789 0 0 0
0%
1 Bhk T 34.84000015258789 0 0 0
0%
2 Bhk 53.65999984741211 0 0 0
0%
2 Bhk 54.06999969482422 0 0 0
0%
2.5 Bhk 60.31999969482422 0 0 0
0%
3 Bhk T 95.54000091552734 0 0 0
0%
3 Bhk T 95.62000274658203 0 0 0
0%
Fst Flr Off 1 29.68000030517578 0 0 0
0%
Fst Flr Off 2 To 4 66.83000183105469 0 0 0
0%
Fst Flr Off 20 83.38999938964844 0 0 0
0%
Fst Flr Off 21 30.0 0 0 0
0%
Fst Flr Off 22 To 27 25.420000076293945 0 0 0
0%
Fst Flr Off 28 36.66999816894531 0 0 0
0%
Grd Off 1A 1B 1C 25.729999542236328 0 0 0
0%
Grd Off 2A 2B 2C 25.729999542236328 0 0 0
0%
Grd Off 3A 3B 3C 25.729999542236328 0 0 0
0%
Grd Off 4A 4B 25.729999542236328 0 0 0
0%
Grd Off 5A 5B 25.729999542236328 0 0 0
0%
Grd Off 6A 6B 22.469999313354492 0 0 0
0%
Grd Shop 1 To 18 33.02000045776367 0 0 0
0%
Grd Shop 22 To 26 18.90999984741211 0 0 0
0%

Building A

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 34.84 45 45 0
100%
1 BHK T 34.84 1 0 1
0%
2 BHK 53.66 24 24 0
100%
2.5 BHK 60.32 24 24 0
100%
3 BHK T 95.54 1 1 0
100%

Building B

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 34.84 45 44 1
98%
1 BHK T 34.84 1 0 1
0%
2 BHK 54.07 48 45 3
94%
3 BHK T 95.62 1 1 0
100%

Commercial 1

Type Carpet (sq.ft) Total Booked Available Status
Fst Flr Off 1 29.68 1 0 1
0%
Fst Flr Off 2 to 4 66.83 3 1 2
33%
Fst Flr Off 20 83.39 1 1 0
100%
Fst Flr Off 21 30.0 1 1 0
100%
Fst Flr Off 22 to 27 25.42 6 6 0
100%
Fst Flr Off 28 36.67 1 1 0
100%
Grd Off 1A 1B 1C 25.73 3 3 0
100%
Grd Off 2A 2B 2C 25.73 3 3 0
100%
Grd Off 3A 3B 3C 25.73 3 3 0
100%
Grd Off 4A 4B 25.73 2 2 0
100%
Grd Off 5A 5B 25.73 2 2 0
100%
Grd Off 6A 6B 22.47 2 2 0
100%
Grd Shop 1 to 18 33.02 18 18 0
100%
Grd Shop 22 to 26 18.91 5 5 0
100%

Construction Progress

Building A

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

Building B

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

Commercial 1

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station 100%
Energy management 100%
Fire Protection And Fire Safety Requirements 100%
Landscaping & Tree Planting 10%
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP) 100%
Solid Waste Management And Disposal
Storm Water Drains 100%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water 100%
Water Conservation, Rain water Harvesting 100%
Water Supply 100%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.