📞 +91 98200 30685 ✉️
RERA: A51800043517

Hubtown Premiere Residences - Beverly

by Hubtown Limited Company
Certificate Signed P51800002671
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51800002671
Registration No.
REA51800009364
Registration Date
2021-09-09
Developer
Hubtown Limited Company
Architect
Aakar Architect (Mr. Umesh Pawar)
Project Bank
HDFC BANK
Proposed Possession
2029-07-31
Revised Possession
2029-07-31
Extended Possession
1900-01-01
Total Units
81
Units Sold
75 (93%)
Buildings
2
Project Area
504.44 sq.m
Total FSI
8257.88
Approved FSI
4078.40
MahaRERA QR
Hubtown Premiere Residences - Beverly
MahaRERA — P51800002671
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors19
Sanctioned19
🏠Habitable19
🔢Total Units31
🏡Residential31
⬇️Basements2
🅿️Closed Parking92
📅Completion2028-07-31
🏗️Proposed Floors16
Sanctioned16
🏠Habitable16
🔢Total Units50
🏡Residential50
⬇️Basements2
🅿️Closed Parking70
📅Completion2028-07-31

Apartment Configurations

Beverly - 14Th To 25Th Floor

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 64.09 2 2 0
100%
2 BHK 64.85 1 1 0
100%
2 BHK 65.17 1 1 0
100%
2 BHK 79.15 1 1 0
100%
3 BHK 93.72 1 1 0
100%
3 BHK 104.09 1 1 0
100%
3 BHK 104.41 5 5 0
100%
3 BHK 104.58 1 1 0
100%
3 BHK 105.32 5 5 0
100%
3 BHK 105.64 1 1 0
100%

Beverly - Upto 13Th Floor

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 48.7 1 1 0
100%
1 BHK 49.21 1 1 0
100%
1 BHK 65.34 1 0 1
0%
2 BHK 63.57 5 3 2
60%
2 BHK 63.86 1 1 0
100%
2 BHK 64.09 7 1 6
14%
2 BHK 64.48 1 0 1
0%
2 BHK 64.65 5 2 3
40%
2 BHK 64.68 1 1 0
100%
2 BHK 64.85 1 1 0
100%
2 BHK 65.17 7 2 5
29%
2 BHK 65.56 1 1 0
100%
2 BHK 69.32 1 1 0
100%
2 BHK 105.13 1 1 0
100%
3 BHK 94.95 1 0 1
0%
3 BHK 103.58 2 2 0
100%
3 BHK 103.9 5 4 1
80%
3 BHK 104.41 6 5 1
83%
3 BHK 104.81 1 1 0
100%
3 BHK 105.13 4 2 2
50%
3 BHK 105.32 1 1 0
100%
3 BHK 105.64 5 5 0
100%
3 BHK 105.76 1 1 0
100%
3 BHK 105.8 1 1 0
100%

Construction Progress

Beverly - 14th to 25th Floor

Basement (if any)100%

Beverly - 14Th To 25Th Floor

Excavation100%

Beverly - 14th to 25th Floor

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%

Beverly - 14Th To 25Th Floor

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate30%

Beverly - 14th to 25th Floor

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%

Beverly - 14Th To 25Th Floor

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises80%

Beverly - 14th to 25th Floor

Plinth100%
Podiums (if any) 100%

Beverly - 14Th To 25Th Floor

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

Beverly - 14th to 25th Floor

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%

Beverly - 14Th To 25Th Floor

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.80%

Beverly - 14th to 25th Floor

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%

Beverly - 14Th To 25Th Floor

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing75%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

Beverly - Upto 13th Floor

Basement (if any)100%

Beverly - Upto 13Th Floor

Excavation100%

Beverly - Upto 13th Floor

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%

Beverly - Upto 13Th Floor

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate30%

Beverly - Upto 13th Floor

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.32%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises88%

Beverly - Upto 13Th Floor

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises86%

Beverly - Upto 13th Floor

Plinth100%
Podiums (if any) 100%

Beverly - Upto 13Th Floor

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises10%

Beverly - Upto 13th Floor

Sanitary Fittings within the flats / premises10%
Slabs of Super Structure100%

Beverly - Upto 13Th Floor

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.92%

Beverly - Upto 13th Floor

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks92%

Beverly - Upto 13Th Floor

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing77%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Club House
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements 40%
Landscaping & Tree Planting 50%
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP) 85%
Solid Waste Management And Disposal
Storm Water Drains 50%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting 10%
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.