📞 +91 98200 30685✉️
RERA: A51800043517

Hubtown Serene - A Wing

by Akruti Gm Joint Venture Others
Certificate SignedP51800009175

Project Information

RERA Certificate No.
P51800009175
Registration No.
REA51800017097
Registration Date
2021-09-09
Developer
Akruti Gm Joint Venture Others
Architect
M/S. Consultants Combined (Mr. Mukesh Bahadur)
Proposed Possession
2029-07-31
Revised Possession
2029-07-31
Extended Possession
1900-01-01
Units Sold
0
Buildings
2
Project Area
318.66 sq.m
Total FSI
4119.04
Approved FSI
2948.24
MahaRERA QR
Hubtown Serene - A Wing
MahaRERA — P51800009175
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors8
Sanctioned8
⬇️Basements2
🅿️Closed Parking12
📅Completion2028-07-31
🏗️Proposed Floors14
Sanctioned14
⬇️Basements2
🅿️Closed Parking32
📅Completion2028-07-31

Apartment Configurations

None

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 Bhk69.16000366210938000
0%
2 Bhk74.70999908447266000
0%
2.5 Bhk89.93000030517578000
0%
4 Bhk111.66000366210938000
0%

Hubtown Serene - A Wing 12Th To 16Th Floor

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK69.16303
0%
2 BHK74.71303
0%
2.5 BHK89.93505
0%
4 BHK111.66101
0%

Hubtown Serene - A Wing Upto 11Th Floor

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK69.1611011
0%
2 BHK74.7110010
0%
2.5 BHK89.9311011
0%

Construction Progress

Hubtown Serene - A Wing 12th to 16th Floor

Basement (if any)0%

Hubtown Serene - A Wing 12Th To 16Th Floor

Excavation0%

Hubtown Serene - A Wing 12th to 16th Floor

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Hubtown Serene - A Wing 12Th To 16Th Floor

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

Hubtown Serene - A Wing 12th to 16th Floor

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Hubtown Serene - A Wing 12Th To 16Th Floor

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%

Hubtown Serene - A Wing 12th to 16th Floor

Plinth0%
Podiums (if any) 0%

Hubtown Serene - A Wing 12Th To 16Th Floor

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

Hubtown Serene - A Wing 12th to 16th Floor

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

Hubtown Serene - A Wing 12Th To 16Th Floor

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

Hubtown Serene - A Wing 12th to 16th Floor

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Hubtown Serene - A Wing 12Th To 16Th Floor

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

Hubtown Serene - A Wing Upto 11th Floor

Basement (if any)0%

Hubtown Serene - A Wing Upto 11Th Floor

Excavation0%

Hubtown Serene - A Wing Upto 11th Floor

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Hubtown Serene - A Wing Upto 11Th Floor

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

Hubtown Serene - A Wing Upto 11th Floor

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Hubtown Serene - A Wing Upto 11Th Floor

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%

Hubtown Serene - A Wing Upto 11th Floor

Plinth0%
Podiums (if any) 0%

Hubtown Serene - A Wing Upto 11Th Floor

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

Hubtown Serene - A Wing Upto 11th Floor

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

Hubtown Serene - A Wing Upto 11Th Floor

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

Hubtown Serene - A Wing Upto 11th Floor

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Hubtown Serene - A Wing Upto 11Th Floor

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.