Integrated Ahana

by Integrated Spaces Limited
Certificate SignedP51800002899

Project Information

RERA Certificate No.
P51800002899
Registration No.
REA51800011871
Registration Date
2023-03-16
Developer
Integrated Spaces Limited
Project Bank
IDBI BANK
Proposed Possession
2018-12-31
Revised Possession
2018-12-31
Extended Possession
2025-04-30
Total Units
27
Units Sold
9 (33%)
Buildings
1
Project Area
953.90 sq.m
Total FSI
2306.00
Approved FSI
1675.00
MahaRERA QR
Integrated Ahana
MahaRERA — P51800002899
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors13
Sanctioned13
🚗Open Parking2
🅿️Closed Parking38
📅Completion2020-10-30

Apartment Configurations

Integrated Ahana

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1RK18.92101
0%
1RK29.84110
100%
2 BHK61.71110
100%
3 BHK78.6110
100%
3 BHK79.34101
0%
3 BHK88.14101
0%
3.5 BHK89.58110
100%
3.5 BHK95.35853
62%

Construction Progress

INTEGRATED AHANA

Basement (if any)100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.76%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.60%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises74%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises72%
Slabs of Super Structure82%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks82%

Integrated Ahana

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate60%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises74%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises72%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.82%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing76%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure82%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station70%
Energy management
Fire Protection And Fire Safety Requirements75%
Landscaping & Tree Planting100%
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)100%
Solid Waste Management And Disposal60%
Storm Water Drains100%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting100%
Water Supply55%
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.