Project Information

RERA Certificate No.
P51800004521
Registration No.
REA51800011904
Registration Date
2023-03-16
Developer
Integrated Spaces Limited
Project Bank
IDBI BANK
Proposed Possession
2019-03-31
Revised Possession
2019-03-31
Extended Possession
2025-04-30
Total Units
167
Units Sold
82 (49%)
Buildings
1
Project Area
3252.00 sq.m
Total FSI
7864.00
Approved FSI
6891.00
MahaRERA QR
Integrated Arya
MahaRERA — P51800004521
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors11
Sanctioned11
⬇️Basements1
🅿️Closed Parking109
📅Completion2021-06-30

Apartment Configurations

Integrated Arya

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK33.17404
0%
1 BHK41.1719154
79%
1 BHK43.6845378
82%
1 BHK44.32110
100%
1RK31.37220
100%
1RK32.01110
100%
2 BHK57.122184
82%
Shop16.77220
100%
Shop19.21220
100%
Shop20.16220
100%
Shop28.7220
100%
Tenant2.6220
100%
Tenant9.37660
100%
Tenant9.38220
100%
Tenant10.2612120
100%
Tenant10.31330
100%
Tenant11.61110
100%
Tenant11.63110
100%
Tenant24.99110
100%
Tenant25.05110
100%
Tenant25.08770
100%

Construction Progress

INTEGRATED ARYA

Basement (if any)100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.82%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.92%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises80%
Slabs of Super Structure88%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks92%

Integrated Arya

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate92%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises85%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises80%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.92%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing82%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure88%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station100%
Energy management
Fire Protection And Fire Safety Requirements100%
Landscaping & Tree Planting100%
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)100%
Solid Waste Management And Disposal100%
Storm Water Drains100%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting100%
Water Supply100%
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.
👋 Looking for the right project? Let me help you find it!
🏗️
MPE Project Advisor
● Online now