📞 +91 98200 30685 ✉️
RERA: A51800043517

JITEN CHS

by M/s Keytech Partnership
Certificate Signed P51800032184
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51800032184
Registration No.
REA51800096504
Registration Date
2021-12-14
Developer
M/s Keytech Partnership
Project Bank
HDFC BANK
Proposed Possession
2024-12-31
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Units Sold
0
Buildings
1
Project Area
3647.10 sq.m
Total FSI
11676.69
Approved FSI
8952.96
MahaRERA QR
JITEN CHS
MahaRERA — P51800032184
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors20
Sanctioned20
🅿️Closed Parking171
📅Completion2024-12-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
A Wing 2 Bhk 51.279998779296875 0 0 0
0%
A Wing 2 Bhk 56.95000076293945 0 0 0
0%
A Wing 3 Bhk 80.54000091552734 0 0 0
0%
A Wing 3 Bhk 80.55000305175781 0 0 0
0%
A Wing 3 Bhk 90.66999816894531 0 0 0
0%
B Wing 2 Bhk 51.279998779296875 0 0 0
0%
B Wing 2 Bhk 54.06999969482422 0 0 0
0%
B Wing 2 Bhk 56.02000045776367 0 0 0
0%
B Wing 2 Bhk 56.38999938964844 0 0 0
0%
B Wing 2 Bhk 62.97999954223633 0 0 0
0%
B Wing 2 Bhk 62.9900016784668 0 0 0
0%
B Wing 3 Bhk 20.25 0 0 0
0%
B Wing 3 Bhk 80.26000213623047 0 0 0
0%
B Wing 3 Bhk 80.2699966430664 0 0 0
0%
B Wing 3 Bhk 80.55000305175781 0 0 0
0%
B Wing 3 Bhk 81.93000030517578 0 0 0
0%
B Wing 3 Bhk 81.94000244140625 0 0 0
0%
B Wing 4 Bhk 112.51000213623047 0 0 0
0%
C Wing 1 Bhk 37.630001068115234 0 0 0
0%
C Wing 1 Bhk 37.900001525878906 0 0 0
0%
C Wing 2 Bhk 63.54999923706055 0 0 0
0%
C Wing 2 Bhk 64.01000213623047 0 0 0
0%
C Wing 2 Bhk 64.37999725341797 0 0 0
0%
C Wing 3 Bhk 82.5 0 0 0
0%
C Wing 3 Bhk 83.1500015258789 0 0 0
0%
Shop 0.8399999737739563 0 0 0
0%
Shop 6.21999979019165 0 0 0
0%
Shop 10.029999732971191 0 0 0
0%
Shop 12.539999961853027 0 0 0
0%

Jiten Chs Abc Wings

Type Carpet (sq.ft) Total Booked Available Status
A WING 2 BHK 51.28 1 1 0
100%
A WING 2 BHK 56.95 1 0 1
0%
A WING 3 BHK 80.54 1 1 0
100%
A WING 3 BHK 80.55 5 5 0
100%
A WING 3 BHK 90.67 2 2 0
100%
B WING 2 BHK 51.28 5 4 1
80%
B WING 2 BHK 54.07 1 0 1
0%
B WING 2 BHK 56.02 4 0 4
0%
B WING 2 BHK 56.39 11 6 5
55%
B WING 2 BHK 62.98 3 3 0
100%
B WING 2 BHK 62.99 2 2 0
100%
B WING 3 BHK 20.25 1 1 0
100%
B WING 3 BHK 80.26 1 1 0
100%
B WING 3 BHK 80.27 8 6 2
75%
B WING 3 BHK 80.55 1 0 1
0%
B WING 3 BHK 81.93 1 1 0
100%
B WING 3 BHK 81.94 8 8 0
100%
B WING 4 BHK 112.51 1 1 0
100%
C WING 1 BHK 37.63 2 0 2
0%
C WING 1 BHK 37.9 13 11 2
85%
C WING 2 BHK 63.55 2 1 1
50%
C WING 2 BHK 64.01 1 0 1
0%
C WING 2 BHK 64.38 23 20 3
87%
C WING 3 BHK 82.5 1 1 0
100%
C WING 3 BHK 83.15 1 1 0
100%
Shop 0.84 1 1 0
100%
Shop 6.22 1 1 0
100%
Shop 10.03 1 1 0
100%
Shop 12.54 1 1 0
100%

Construction Progress

JITEN CHS ABC WINGS

Basement (if any)100%

Jiten Chs Abc Wings

Excavation100%

JITEN CHS ABC WINGS

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Jiten Chs Abc Wings

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate90%

JITEN CHS ABC WINGS

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Jiten Chs Abc Wings

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%

JITEN CHS ABC WINGS

Plinth100%
Podiums (if any) 100%

Jiten Chs Abc Wings

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises95%

JITEN CHS ABC WINGS

Sanitary Fittings within the flats / premises98%
Slabs of Super Structure100%

Jiten Chs Abc Wings

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.95%

JITEN CHS ABC WINGS

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Jiten Chs Abc Wings

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing95%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station 95%
Energy management
Fire Protection And Fire Safety Requirements 95%
FITNESS CENTER
Landscaping & Tree Planting 80%
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP) 90%
Solid Waste Management And Disposal 100%
Storm Water Drains 95%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting 100%
Water Supply 90%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.