📞 +91 98200 30685 ✉️
RERA: A51800043517

Joy Legend Wing A

by JAYANT SONI Individual
Certificate Signed P51800005022
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51800005022
Registration No.
REA51800009869
Registration Date
2017-08-09
Developer
JAYANT SONI Individual
Architect
Jayant Tipnisconsultants
Project Bank
AXIS BANK
Proposed Possession
2018-12-31
Revised Possession
2018-12-31
Extended Possession
2019-12-31
Units Sold
0
Buildings
1
Project Area
2450.73 sq.m
Total FSI
15686.96
Approved FSI
14877.96
MahaRERA QR
Joy Legend Wing A
MahaRERA — P51800005022
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors25
Sanctioned25
⬇️Basements3
🅿️Closed Parking240
📅Completion2018-12-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
3Bhk 140.75 0 0 0
0%
4Bhk 182.27999877929688 0 0 0
0%
Shop1 135.25999450683594 0 0 0
0%
Shop2 104.13999938964844 0 0 0
0%
Shop3 169.6300048828125 0 0 0
0%
Shop4 168.61000061035156 0 0 0
0%
Shop5 145.0 0 0 0
0%

Joy Legend Wing A

Type Carpet (sq.ft) Total Booked Available Status
3 BHK 140.75 76 44 32
58%
4 BHK 182.28 13 4 9
31%
Shop1 135.26 1 1 0
100%
Shop2 104.14 1 1 0
100%
Shop3 169.63 1 1 0
100%
Shop4 168.61 1 1 0
100%
Shop5 145.0 1 0 1
0%

Construction Progress

Joy Legend Wing A

Basement (if any)95%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate45%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.45%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises45%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises45%
Plinth95%
Podiums (if any) 77%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises4%
Sanitary Fittings within the flats / premises4%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.64%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks64%
Stilt Floor85%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing60%
X number of Basement(s) and Plinth95%
X number of Podiums77%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station 5%
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains 80%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting 80%
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.