📞 +91 98200 30685✉️
RERA: A51800043517

Kabra Aurum Wing A B C And D Redevelopment Of Goregaon Unnat Nagar Ii Plot No 51 To 55 Chsl

by Kabra And Associates Partnership
Certificate SignedP51800005550

Project Information

RERA Certificate No.
P51800005550
Registration No.
REA51800011512
Registration Date
2017-08-11
Developer
Kabra And Associates Partnership
Architect
Arch Hemant Talaty
Project Bank
KOTAK MAHINDRA BANK LIMITED
Proposed Possession
2019-12-31
Revised Possession
2019-12-31
Extended Possession
1900-01-01
Units Sold
0
Buildings
1
Project Area
3281.02 sq.m
Total FSI
15328.41
Approved FSI
15328.41
MahaRERA QR
Kabra Aurum Wing A B C And D Redevelopment Of Goregaon Unnat Nagar Ii Plot No 51 To 55 Chsl
MahaRERA — P51800005550
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors24
Sanctioned24
🚗Open Parking6
🅿️Closed Parking149
📅Completion1900-01-01

Apartment Configurations

Kabra Aurum

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK TYPE 135.1217170
100%
1 BHK TYPE 237.811037
30%
1 BHK TYPE 341.8118180
100%
1 BHK TYPE 449.2437370
100%
2 BHK TYPE 159.3719190
100%
2 BHK TYPE 260.39220
100%
2 BHK TYPE 364.8516160
100%
2 BHK TYPE 469.68220
100%
2 BHK TYPE 570.3312120
100%
2 BHK TYPE 671.5433330
100%
2.5 BHK TYPE 177.02101
0%
3 BHK TYPE 181.5719190
100%
3 BHK TYPE 287.4219172
89%
3 BHK TYPE 3120.78220
100%
4 BHK TYPE 1108.98880
100%

None

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 Bhk Type 135.119998931884766000
0%
1 Bhk Type 237.810001373291016000
0%
1 Bhk Type 341.810001373291016000
0%
1 Bhk Type 449.2400016784668000
0%
2 Bhk Type 159.369998931884766000
0%
2 Bhk Type 260.38999938964844000
0%
2 Bhk Type 364.8499984741211000
0%
2 Bhk Type 469.68000030517578000
0%
2 Bhk Type 570.33000183105469000
0%
2 Bhk Type 671.54000091552734000
0%
2.5 Bhk Type 177.0199966430664000
0%
3 Bhk Type 181.56999969482422000
0%
3 Bhk Type 287.41999816894531000
0%
3 Bhk Type 3120.77999877929688000
0%
4 Bhk Type 1108.9800033569336000
0%

Construction Progress

KABRA AURUM

Basement (if any)0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth0%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Kabra Aurum

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth0%
X number of Podiums100%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space100%
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station100%
Energy management
Fire Protection And Fire Safety Requirements100%
Landscaping & Tree Planting100%
Open Parking100%
Sewerage (Chamber, Lines, Septic Tank , STP)100%
Solid Waste Management And Disposal
Storm Water Drains100%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting100%
Water Supply100%
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.