Project Information

RERA Certificate No.
P51700026352
Registration No.
REA51700075867
Registration Date
2023-08-11
Developer
RAI RESIDENCY Private Limited Company
Architect
De Con Consultants
Project Bank
KARNATAKA BANK LIMITED
Proposed Possession
2024-06-30
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Total Units
113
Units Sold
42 (37%)
Buildings
2
Project Area
337.26 sq.m
Total FSI
2605.00
Approved FSI
2605.00
MahaRERA QR
KAIRALI PARK
MahaRERA — P51700026352
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors20
Sanctioned20
🔢Total Units111
🏡Residential111
⬇️Basements1
🚗Open Parking32
📅Completion2023-12-31
🏗️Proposed Floors2
Sanctioned2
🔢Total Units2
🏡Residential2
🚗Open Parking3
📅Completion2023-12-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1Bhk 41.02000045776367 0 0 0
0%
1Bhk 41.04999923706055 0 0 0
0%
1Bhk 46.54999923706055 0 0 0
0%
1Bhk 46.900001525878906 0 0 0
0%
2Bhk 50.38999938964844 0 0 0
0%
2Bhk 50.650001525878906 0 0 0
0%
2Bhk 54.97999954223633 0 0 0
0%
2Bhk 55.31999969482422 0 0 0
0%
2Bhk 56.900001525878906 0 0 0
0%
2Bhk 57.130001068115234 0 0 0
0%
Office Space 161.3000030517578 0 0 0
0%
Shop 10.779999732971191 0 0 0
0%
Shop 11.680000305175781 0 0 0
0%
Shop 14.539999961853027 0 0 0
0%
Shop 35.630001068115234 0 0 0
0%
Shop 36.310001373291016 0 0 0
0%
Shop 41.90999984741211 0 0 0
0%

Building No 2 A Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 41.02 16 14 2
88%
1 BHK 41.05 19 17 2
89%
1 BHK 46.55 5 4 1
80%
1 BHK 46.9 5 5 0
100%
2 BHK 50.39 18 9 9
50%
2 BHK 50.65 20 10 10
50%
2 BHK 54.98 4 0 4
0%
2 BHK 55.32 5 3 2
60%
2 BHK 56.9 9 9 0
100%
2 BHK 57.13 10 5 5
50%

Building No 3

Type Carpet (sq.ft) Total Booked Available Status
Office space 161.3 1 0 1
0%
Shop 10.78 1 0 1
0%
Shop 11.68 1 0 1
0%
Shop 14.54 1 0 1
0%
Shop 35.63 1 0 1
0%
Shop 36.31 1 0 1
0%
Shop 41.91 1 0 1
0%

Construction Progress

BUILDING NO 2 A WING

Basement (if any)100%

Building No 2 A Wing

Excavation100%

BUILDING NO 2 A WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%

Building No 2 A Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate25%

BUILDING NO 2 A WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%

Building No 2 A Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises85%

BUILDING NO 2 A WING

Plinth100%
Podiums (if any) 0%

Building No 2 A Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises45%

BUILDING NO 2 A WING

Sanitary Fittings within the flats / premises45%
Slabs of Super Structure20%

Building No 2 A Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.25%

BUILDING NO 2 A WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks25%

Building No 2 A Wing

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing85%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure20%

BUILDING NO 3

Basement (if any)1%

Building No 3

Excavation100%

BUILDING NO 3

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Building No 3

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

BUILDING NO 3

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Building No 3

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%

BUILDING NO 3

Plinth1%
Podiums (if any) 0%

Building No 3

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

BUILDING NO 3

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure2%

Building No 3

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

BUILDING NO 3

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Building No 3

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth1%
X number of Podiums0%
X number of Slabs of Super Structure2%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.