Proposed Possession
2022-04-30
Revised Possession
2022-04-30
Extended Possession
1900-01-01
Units Sold
0
Buildings
2
Project Area
8100.00 sq.m
Total FSI
20420.00
Approved FSI
14688.00
MahaRERA QR
Kalpataru Yashodhan
MahaRERA — P51800000442
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors18
Sanctioned18
⬇️Basements3
🚗Open Parking7
🅿️Closed Parking320
📅Completion2021-04-30
🏗️Proposed Floors18
Sanctioned18
⬇️Basements3
🚗Open Parking2
🅿️Closed Parking137
📅Completion2021-04-30

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
2Bhk 69.63999938964844 0 0 0
0%
2Bhk 69.75 0 0 0
0%
2Bhk 69.7699966430664 0 0 0
0%
2Bhk 69.77999877929688 0 0 0
0%
2Bhk 70.5199966430664 0 0 0
0%
3 Bhk 83.94999694824219 0 0 0
0%
3 Bhk 116.98999786376953 0 0 0
0%
3 Bhk 118.08000183105469 0 0 0
0%
3 Bhk 119.01000213623047 0 0 0
0%
3 Bhk 120.11000061035156 0 0 0
0%
3 Bhk 129.4499969482422 0 0 0
0%
3Bhk 83.08000183105469 0 0 0
0%
3Bhk 83.29000091552734 0 0 0
0%

Wing A, B And C

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 69.64 3 2 1
67%
2 BHK 69.75 2 2 0
100%
2 BHK 69.77 1 1 0
100%
2 BHK 69.78 4 4 0
100%
2 BHK 70.52 2 2 0
100%
3 BHK 83.08 1 1 0
100%
3 BHK 83.29 1 1 0
100%
3 BHK 83.95 1 1 0
100%
3 BHK 129.45 9 6 3
67%

Wing D And E

Type Carpet (sq.ft) Total Booked Available Status
3 BHK 116.99 12 8 4
67%
3 BHK 118.08 13 7 6
54%
3 BHK 119.01 13 7 6
54%
3 BHK 120.11 13 8 5
62%

Construction Progress

Wing A, B and C

Basement (if any)100%

Wing A, B And C

Excavation100%

Wing A, B and C

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing A, B And C

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

Wing A, B and C

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing A, B And C

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

Wing A, B and C

Plinth100%
Podiums (if any) 0%

Wing A, B And C

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

Wing A, B and C

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing A, B And C

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

Wing A, B and C

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing A, B And C

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Wing D and E

Basement (if any)100%

Wing D And E

Excavation100%

Wing D and E

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.97%

Wing D And E

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate70%

Wing D and E

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises87%

Wing D And E

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises87%

Wing D and E

Plinth100%
Podiums (if any) 0%

Wing D And E

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises45%

Wing D and E

Sanitary Fittings within the flats / premises45%
Slabs of Super Structure100%

Wing D And E

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

Wing D and E

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing D And E

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing97%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space 100%
Club House,Fitness Centre Swimming pool & other Recreation areas 100%
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station 100%
Energy management 96%
Fire Protection And Fire Safety Requirements 100%
Landscaping & Tree Planting 96%
NA
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP) 100%
Solid Waste Management And Disposal 99%
Storm Water Drains 100%
Street Lighting 100%
Treatment And Disposal Of Sewage And Sullage Water 100%
Water Conservation, Rain water Harvesting 100%
Water Supply 100%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.