📞 +91 98200 30685 ✉️
RERA: A51800043517

Kalpavruksh Garden III

by Mahendra J Vora & Others Others
Certificate Signed P51800007112
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51800007112
Registration No.
REA51800017184
Registration Date
2020-06-14
Developer
Mahendra J Vora & Others Others
Architect
Abhijit A Mehta
Project Bank
BHARAT COOPERATIVE BANK MUMBAI LIMITED
Proposed Possession
2021-06-30
Revised Possession
2021-06-30
Extended Possession
1900-01-01
Units Sold
0
Buildings
3
Project Area
567.00 sq.m
Total FSI
13017.00
Approved FSI
5517.00
MahaRERA QR
Kalpavruksh Garden III
MahaRERA — P51800007112
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors25
Sanctioned25
🅿️Closed Parking40
📅Completion2021-06-30
🏗️Proposed Floors25
Sanctioned25
🅿️Closed Parking60
📅Completion2020-12-31
🏗️Proposed Floors30
Sanctioned30
📅Completion2021-06-30

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1Bhk 38.400001525878906 0 0 0
0%
1Bhk Study 47.099998474121094 0 0 0
0%
1Bhk Ulc Flat 38.400001525878906 0 0 0
0%
1Bhkstudy 51.79999923706055 0 0 0
0%
1Rk Bmc Flat 25.260000228881836 0 0 0
0%
1Rk Bmc Flat 25.940000534057617 0 0 0
0%
2Bhk 69.73999786376953 0 0 0
0%
2Bhkstudy 63.5 0 0 0
0%
3Bhk 88.69000244140625 0 0 0
0%
3Bhk 91.1500015258789 0 0 0
0%

A Wing

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 69.74 20 9 11
45%
3 BHK 88.69 1 1 0
100%
3 BHK 91.15 18 11 7
61%

B Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 38.4 81 54 27
67%
1 BHK Study 47.1 1 0 1
0%
1 BHK ULC FLAT 38.4 2 0 2
0%
1RK BMC FLAT 25.26 1 1 0
100%
1RK BMC FLAT 25.94 2 2 0
100%

C Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHKStudy 51.8 24 0 24
0%
2 BHKStudy 63.5 27 0 27
0%

Construction Progress

A Wing

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises60%
Slabs of Super Structure75%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
Stilt Floor 100%

B Wing

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises75%
Slabs of Super Structure75%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
Stilt Floor 100%

C Wing

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 0%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station 60%
Energy management
Fire Protection And Fire Safety Requirements 60%
Landscaping & Tree Planting 60%
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP) 60%
Solid Waste Management And Disposal 60%
Storm Water Drains 90%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting 60%
Water Supply 60%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.