📞 +91 98200 30685 ✉️
RERA: A51800043517

Kohinoor Majestic

by Sonu Anilkumar Hotchandani Individual
Certificate Signed P51700019868
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700019868
Registration No.
REA51700053617
Registration Date
2021-09-09
Developer
Sonu Anilkumar Hotchandani Individual
Architect
John Varghese
Project Bank
KOTAK MAHINDRA BANK LIMITED
Proposed Possession
2023-12-30
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Units Sold
0
Buildings
2
Project Area
3287.93 sq.m
Total FSI
22730.58
Approved FSI
2730.58
MahaRERA QR
Kohinoor Majestic
MahaRERA — P51700019868
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors17
Sanctioned17
🅿️Closed Parking1
📅Completion2022-12-31
🏗️Proposed Floors9
Sanctioned9
🅿️Closed Parking4
📅Completion2022-12-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1Bhk 32.59000015258789 0 0 0
0%
1Bhk 33.2599983215332 0 0 0
0%
1Bhk 33.27000045776367 0 0 0
0%
1Bhk 33.7400016784668 0 0 0
0%
1Bhk 33.75 0 0 0
0%
1Bhk 33.77000045776367 0 0 0
0%
1Bhk 34.08000183105469 0 0 0
0%
1Bhk 34.59000015258789 0 0 0
0%
1Bhk 34.619998931884766 0 0 0
0%
1Bhk 35.41999816894531 0 0 0
0%
1Bhk 35.43000030517578 0 0 0
0%
1Bhk 35.459999084472656 0 0 0
0%
1Bhk 35.779998779296875 0 0 0
0%
1Bhk 35.810001373291016 0 0 0
0%
1Bhk 35.869998931884766 0 0 0
0%
1Bhk 35.97999954223633 0 0 0
0%
1Bhk 36.0 0 0 0
0%
1Bhk 36.06999969482422 0 0 0
0%
1Bhk 36.27000045776367 0 0 0
0%
1Bhk 36.63999938964844 0 0 0
0%
1Bhk 36.810001373291016 0 0 0
0%
1Bhk 36.84000015258789 0 0 0
0%
1Bhk 36.91999816894531 0 0 0
0%
1Bhk 37.650001525878906 0 0 0
0%
1Bhk 38.04999923706055 0 0 0
0%
1Rk 20.670000076293945 0 0 0
0%
2Bhk 43.5099983215332 0 0 0
0%
2Bhk 46.75 0 0 0
0%
2Bhk 47.25 0 0 0
0%
2Bhk 47.43000030517578 0 0 0
0%
2Bhk 47.84000015258789 0 0 0
0%
2Bhk 48.130001068115234 0 0 0
0%
2Bhk 48.439998626708984 0 0 0
0%
2Bhk 50.68000030517578 0 0 0
0%
2Bhk 53.349998474121094 0 0 0
0%
2Bhk 53.599998474121094 0 0 0
0%
2Bhk 55.400001525878906 0 0 0
0%
2Bhk 55.650001525878906 0 0 0
0%

Building 1

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 32.59 1 1 0
100%
1 BHK 33.26 1 1 0
100%
1 BHK 33.27 1 1 0
100%
1 BHK 33.74 10 10 0
100%
1 BHK 33.75 10 9 1
90%
1 BHK 33.77 20 20 0
100%
1 BHK 34.08 1 1 0
100%
1 BHK 34.59 5 5 0
100%
1 BHK 34.62 5 5 0
100%
1 BHK 35.42 5 5 0
100%
1 BHK 35.43 4 4 0
100%
1 BHK 35.46 1 1 0
100%
1 BHK 35.78 5 5 0
100%
1 BHK 35.81 5 5 0
100%
1 BHK 35.87 1 1 0
100%
1 BHK 35.98 5 5 0
100%
1 BHK 36.0 5 5 0
100%
1 BHK 36.07 13 11 2
85%
1 BHK 36.27 4 4 0
100%
1 BHK 36.64 5 5 0
100%
1 BHK 36.81 5 4 1
80%
1 BHK 36.84 4 3 1
75%
1 BHK 36.92 1 1 0
100%
1 BHK 37.65 4 4 0
100%
1 BHK 38.05 4 3 1
75%
1RK 20.67 1 1 0
100%
2 BHK 43.51 2 2 0
100%
2 BHK 47.25 10 10 0
100%
2 BHK 47.43 10 10 0
100%
2 BHK 50.68 3 3 0
100%
2 BHK 53.35 1 1 0
100%
2 BHK 53.6 1 1 0
100%
2 BHK 55.4 3 2 1
67%
2 BHK 55.65 3 2 1
67%

Building 2

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 46.75 1 0 1
0%
2 BHK 47.84 7 4 3
57%
2 BHK 48.13 3 2 1
67%
2 BHK 48.44 3 1 2
33%

Construction Progress

Building 1

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate97%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.97%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Building 2

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space 100%
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station 100%
Energy management 100%
Fire Protection And Fire Safety Requirements 100%
Landscaping & Tree Planting 100%
Open Parking 95%
Sewerage (Chamber, Lines, Septic Tank , STP) 90%
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting 100%
Treatment And Disposal Of Sewage And Sullage Water 95%
Water Conservation, Rain water Harvesting 90%
Water Supply 75%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.