RERA: A51800043517

LA LUXURIA

by RJ ENTERPRISES Partnership
Certificate Signed P51700030059
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700030059
Registration No.
REA51700091138
Registration Date
2021-07-29
Developer
RJ ENTERPRISES Partnership
Architect
Rahul Shivaji Agaj, M/S Elevation Designers & Planners Pvt. Ltd.
Project Bank
HDFC BANK
Proposed Possession
2025-12-31
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Units Sold
0
Buildings
3
Project Area
10784.00 sq.m
Total FSI
15680.36
Approved FSI
15680.36
MahaRERA QR
LA LUXURIA
MahaRERA — P51700030059
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors10
Sanctioned10
🅿️Closed Parking22
📅Completion2025-12-31
🏗️Proposed Floors10
Sanctioned10
🅿️Closed Parking1
📅Completion2025-12-31
🏗️Proposed Floors10
Sanctioned10
🅿️Closed Parking1
📅Completion2025-12-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1Bhk 38.0099983215332 0 0 0
0%
1Bhk 41.900001525878906 0 0 0
0%
2Bhk 55.04999923706055 0 0 0
0%
2Bhk 57.06999969482422 0 0 0
0%
Shop 21.579999923706055 0 0 0
0%
Shop 27.860000610351562 0 0 0
0%
Shop 51.75 0 0 0
0%
Shop 63.09000015258789 0 0 0
0%
Shop 70.25 0 0 0
0%
Shop 70.43000030517578 0 0 0
0%
Shop 75.25 0 0 0
0%
Shop 76.13999938964844 0 0 0
0%
Shop 78.69999694824219 0 0 0
0%
Shop 80.44999694824219 0 0 0
0%
Shop 82.4800033569336 0 0 0
0%
Shop 91.75 0 0 0
0%

A

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 38.01 32 0 32
0%
1 BHK 41.9 40 0 40
0%
Shop 70.25 2 0 2
0%
Shop 70.43 1 0 1
0%
Shop 80.45 2 0 2
0%
Shop 82.48 2 0 2
0%

B

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 55.05 36 0 36
0%
2 BHK 57.07 27 0 27
0%
Shop 21.58 2 0 2
0%
Shop 27.86 2 0 2
0%
Shop 51.75 1 0 1
0%
Shop 75.25 2 0 2
0%
Shop 78.7 2 0 2
0%

C

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 38.01 38 0 38
0%
1 BHK 41.9 47 0 47
0%
Shop 63.09 1 0 1
0%
Shop 76.14 1 0 1
0%
Shop 91.75 1 0 1
0%

Construction Progress

A

Basement (if any)50%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing24%
Plinth50%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure40%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor50%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth50%
X number of Podiums0%
X number of Slabs of Super Structure40%

B

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing68%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing90%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

C

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing67%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing90%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.