Project Information

RERA Certificate No.
P51800005647
Registration No.
REA51800018505
Registration Date
2021-09-09
Developer
Messrs SRC And Associates Partnership
Architect
Aakaar Architects & Consultants
Project Bank
HDFC BANK
Proposed Possession
2023-12-30
Revised Possession
2023-12-30
Extended Possession
1900-01-01
Units Sold
0
Buildings
2
Project Area
5778.40 sq.m
Total FSI
17041.14
Approved FSI
11010.45
MahaRERA QR
One Aquaria
MahaRERA — P51800005647
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors7
Sanctioned7
⬇️Basements1
🚗Open Parking28
🅿️Closed Parking38
📅Completion1900-01-01
🏗️Proposed Floors39
Sanctioned39
🚗Open Parking10
🅿️Closed Parking194
📅Completion2022-12-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
2 Bhk A 108.62000274658203 0 0 0
0%
2 Bhk B 109.01000213623047 0 0 0
0%
2 Bhk C 123.94000244140625 0 0 0
0%
2 Bhk D 124.37999725341797 0 0 0
0%
3 Bhk A 135.08999633789062 0 0 0
0%
3 Bhk B 135.47999572753906 0 0 0
0%
3 Bhk C 135.47999572753906 0 0 0
0%
3 Bhk D 151.1999969482422 0 0 0
0%
3 Bhk E 152.2100067138672 0 0 0
0%
3 Bhk F 152.05999755859375 0 0 0
0%
3 Bhk G 171.77000427246094 0 0 0
0%
3 Bhk H 172.22999572753906 0 0 0
0%
4 Bhk A 182.80999755859375 0 0 0
0%
4 Bhk B 182.9600067138672 0 0 0
0%
4 Bhk C 182.9600067138672 0 0 0
0%
4 Bhk D 202.52000427246094 0 0 0
0%
4 Bhk E 181.49000549316406 0 0 0
0%
6 Bhk 296.69000244140625 0 0 0
0%
8 Bhk 396.2699890136719 0 0 0
0%
S1 10.890000343322754 0 0 0
0%
S2 13.329999923706055 0 0 0
0%
S3 16.520000457763672 0 0 0
0%
S4 17.299999237060547 0 0 0
0%
S5 33.4900016784668 0 0 0
0%
S6 159.38999938964844 0 0 0
0%
S7 366.760009765625 0 0 0
0%

One Aquaria Commercial

Type Carpet (sq.ft) Total Booked Available Status
S1 10.89 1 0 1
0%
S2 13.33 2 0 2
0%
S3 16.52 1 0 1
0%
S4 17.3 1 0 1
0%
S5 33.49 3 0 3
0%
S6 159.39 1 0 1
0%
S7 366.76 6 0 6
0%

One Aquaria Residential

Type Carpet (sq.ft) Total Booked Available Status
2 BHK A 108.62 1 0 1
0%
2 BHK B 109.01 1 0 1
0%
2 BHK C 123.94 2 0 2
0%
2 BHK D 124.38 1 0 1
0%
3 BHK A 135.09 4 2 2
50%
3 BHK B 135.48 4 0 4
0%
3 BHK C 135.48 1 1 0
100%
3 BHK D 151.2 16 6 10
38%
3 BHK E 152.21 1 0 1
0%
3 BHK F 152.06 1 0 1
0%
3 BHK G 171.77 3 2 1
67%
3 BHK H 172.23 1 1 0
100%
4 BHK A 182.81 4 0 4
0%
4 BHK B 182.96 4 0 4
0%
4 BHK C 182.96 1 1 0
100%
4 BHK D 202.52 17 10 7
59%
4 BHK E 181.49 1 0 1
0%
6 BHK 296.69 1 0 1
0%
8 BHK 396.27 1 0 1
0%

Construction Progress

One Aquaria Commercial

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Plinth0%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

One Aquaria Residential

Basement (if any)70%
Excavation70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises5%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises5%
Plinth70%
Podiums (if any) 70%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure79%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.57%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks57%
Stilt Floor70%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing20%
X number of Basement(s) and Plinth70%
X number of Podiums70%
X number of Slabs of Super Structure79%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
FITNESS CENTER
GARDEN ON GROUND LEVEL
Garden on Top Podium
KIDS PLAY AREA
Landscaping & Tree Planting
Open Parking
Outdoor kids play area with equipments
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.