📞 +91 98200 30685 ✉️
RERA: A51800043517

Lotus Residency

by Lotus Logistics and Developers pvt ltd Company
Certificate Signed P51800006322
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51800006322
Registration No.
REA51800017229
Registration Date
2020-06-14
Developer
Lotus Logistics and Developers pvt ltd Company
Architect
Snehal Shah
Project Bank
HDFC BANK
Proposed Possession
2021-06-30
Revised Possession
2021-06-30
Extended Possession
2024-12-31
Units Sold
0
Buildings
1
Project Area
2465.34 sq.m
Total FSI
15440.00
Approved FSI
10730.36
MahaRERA QR
Lotus Residency
MahaRERA — P51800006322
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors25
Sanctioned25
⬇️Basements1
🅿️Closed Parking112
📅Completion2020-12-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1Bhk 27.40999984741211 0 0 0
0%
1Bhk 29.6299991607666 0 0 0
0%
1Bhk 38.869998931884766 0 0 0
0%
1Bhk 39.439998626708984 0 0 0
0%
1Bhk 39.45000076293945 0 0 0
0%
1Bhk 39.970001220703125 0 0 0
0%
1Bhk 40.54999923706055 0 0 0
0%
2Bhk 44.40999984741211 0 0 0
0%
2Bhk 56.97999954223633 0 0 0
0%
2Bhk 57.619998931884766 0 0 0
0%
2Bhk 62.41999816894531 0 0 0
0%
Office Space 19.049999237060547 0 0 0
0%
Office Space 19.950000762939453 0 0 0
0%
Office Space 52.779998779296875 0 0 0
0%
Office Space 153.5800018310547 0 0 0
0%
Shop 28.799999237060547 0 0 0
0%
Shop 29.1299991607666 0 0 0
0%
Shop 29.459999084472656 0 0 0
0%

Lotus Residency

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 27.41 2 2 0
100%
1 BHK 29.63 1 0 1
0%
1 BHK 38.87 35 19 16
54%
1 BHK 39.44 19 11 8
58%
1 BHK 39.45 15 3 12
20%
1 BHK 39.97 37 27 10
73%
1 BHK 40.55 43 28 15
65%
2 BHK 44.41 20 20 0
100%
2 BHK 56.98 20 8 12
40%
2 BHK 57.62 20 10 10
50%
2 BHK 62.42 1 1 0
100%
Office space 19.05 1 0 1
0%
Office space 19.95 1 0 1
0%
Office space 52.78 1 0 1
0%
Office space 153.58 1 0 1
0%
Shop 28.8 1 1 0
100%
Shop 29.13 1 1 0
100%
Shop 29.46 1 0 1
0%

Construction Progress

Lotus Residency

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises90%
Overall Percentage of Completion of the work done For the entire Building /Wing79%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises80%
Sanitary Fittings within the flats / premises80%
Slabs of Super Structure90%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
Stilt Floor90%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing90%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure90%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station 50%
Energy management
Fire Protection And Fire Safety Requirements 70%
Landscaping & Tree Planting 50%
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP) 50%
Solid Waste Management And Disposal 100%
Storm Water Drains 50%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting 100%
Water Supply 70%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.