📞 +91 98200 30685 ✉️
RERA: A51800043517

MARATHON MILLENNIUM 1

by TERRAPOLIS ASSETS PVT LTD Company
Certificate Signed P51800017324
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51800017324
Registration No.
REA51800041219
Registration Date
2023-11-07
Developer
TERRAPOLIS ASSETS PVT LTD Company
Project Bank
ICICI BANK LIMITED
Proposed Possession
2024-06-30
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Units Sold
0
Buildings
1
Project Area
1296.00 sq.m
Total FSI
8864.00
Approved FSI
6364.00
MahaRERA QR
MARATHON MILLENNIUM 1
MahaRERA — P51800017324
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors22
Sanctioned22
⬇️Basements1
🅿️Closed Parking100
📅Completion2024-06-30

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
Office Space 32.52000045776367 0 0 0
0%
Office Space 32.97999954223633 0 0 0
0%
Office Space 33.439998626708984 0 0 0
0%
Office Space 34.369998931884766 0 0 0
0%
Office Space 34.84000015258789 0 0 0
0%
Office Space 35.29999923706055 0 0 0
0%
Office Space 36.22999954223633 0 0 0
0%
Office Space 39.95000076293945 0 0 0
0%
Office Space 47.380001068115234 0 0 0
0%
Office Space 55.7400016784668 0 0 0
0%
Office Space 62.2400016784668 0 0 0
0%
Office Space 67.81999969482422 0 0 0
0%
Office Space 71.52999877929688 0 0 0
0%
Office Space 106.83999633789062 0 0 0
0%
Office Space 111.4800033569336 0 0 0
0%
Office Space 162.5800018310547 0 0 0
0%
Office Space 198.80999755859375 0 0 0
0%
Office Space 230.39999389648438 0 0 0
0%
Office Space 411.2799987792969 0 0 0
0%
Office Space 454.57000732421875 0 0 0
0%
Office Space 638.7000122070312 0 0 0
0%
Shop 11.609999656677246 0 0 0
0%
Shop 19.969999313354492 0 0 0
0%
Shop 63.63999938964844 0 0 0
0%

Marathon Millennium 1

Type Carpet (sq.ft) Total Booked Available Status
Office space 11.61 2 0 2
0%
Office space 19.97 2 0 2
0%
Office space 32.52 9 8 1
89%
Office space 32.98 3 1 2
33%
Office space 33.44 16 14 2
88%
Office space 34.37 9 8 1
89%
Office space 34.84 3 2 1
67%
Office space 35.3 11 11 0
100%
Office space 35.77 6 6 0
100%
Office space 36.23 7 7 0
100%
Office space 39.94 1 1 0
100%
Office space 47.38 1 1 0
100%
Office space 55.74 8 6 2
75%
Office space 62.24 9 8 1
89%
Office space 63.64 1 0 1
0%
Office space 67.81 1 1 0
100%
Office space 71.53 1 1 0
100%
Office space 106.84 10 9 1
90%
Office space 111.47 1 1 0
100%
Office space 162.58 1 1 0
100%
Office space 198.81 1 1 0
100%
Office space 230.4 1 1 0
100%
Office space 411.28 1 1 0
100%
Office space 454.57 1 1 0
100%
Office space 638.7 1 1 0
100%

Construction Progress

MARATHON MILLENNIUM 1

Basement (if any)100%

Marathon Millennium 1

Excavation100%

MARATHON MILLENNIUM 1

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Marathon Millennium 1

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate92%

MARATHON MILLENNIUM 1

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.92%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Marathon Millennium 1

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%

MARATHON MILLENNIUM 1

Plinth100%
Podiums (if any) 0%

Marathon Millennium 1

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

MARATHON MILLENNIUM 1

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%

Marathon Millennium 1

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

MARATHON MILLENNIUM 1

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Marathon Millennium 1

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station 100%
Energy management
Fire Protection And Fire Safety Requirements 100%
Landscaping & Tree Planting 85%
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP) 100%
Solid Waste Management And Disposal 95%
Storm Water Drains 100%
Street Lighting 25%
Treatment And Disposal Of Sewage And Sullage Water 100%
Water Conservation, Rain water Harvesting 90%
Water Supply 100%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.