📞 +91 98200 30685 ✉️
RERA: A51800043517

Mumbra Landmark

by Jyoti Industries
Kept in Abeyance P51700015369
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700015369
Registration No.
REA51700032314
Developer
Jyoti Industries
Project Bank
AXIS BANK LTD
Proposed Possession
2024-12-30
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Buildings
3
Project Area
3000.00 sq.m
Total FSI
3585.66
MahaRERA QR
Mumbra Landmark
MahaRERA — P51700015369
Scan to verify on MahaRERA portal

Wing-wise Details

🅿️Closed Parking29
📅Completion2023-12-31
🅿️Closed Parking1
📅Completion2023-12-31
⬇️Basements1
🅿️Closed Parking1
📅Completion2023-12-31

Apartment Configurations

Building A

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 37.87 1 0 1
0%
1 BHK 38.7 7 0 7
0%
1 BHK 50.76 7 1 6
14%
1 BHK 52.11 7 1 6
14%
1 RK 35.13 1 0 1
0%
1 RK 35.67 1 0 1
0%
2 BHK 50.73 7 0 7
0%

Building B

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 35.31 1 0 1
0%
1 BHK 36.07 1 0 1
0%
1 BHK 36.19 7 1 6
14%
1 BHK 36.95 7 1 6
14%
1 RK 33.31 1 0 1
0%
1 RK 34.27 7 0 7
0%
2 BHK 52.12 7 2 5
29%

Building C

Type Carpet (sq.ft) Total Booked Available Status
1 RK 30.47 2 0 2
0%
1 RK 30.91 2 0 2
0%
1 RK 31.31 4 0 4
0%
AMINITY AREA TO TMC 145.71 1 0 1
0%
CONSULTING ROOM 24.38 3 0 3
0%
EXAMINATION ROOM 24.93 2 0 2
0%
EXAMINATION ROOM 35.17 1 0 1
0%
GENERAL WARD 62.5 1 0 1
0%
GENTS LADIES WARD 62.5 2 0 2
0%
SHOP 136.78 1 1 0
100%
SPECIAL ROOM TO TMC 20.47 2 0 2
0%

Construction Progress

Building A

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate20%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises80%
Overall Percentage of Completion of the work done For the entire Building /Wing74%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises80%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.80%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing80%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Building B

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate20%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises80%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises60%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.75%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing80%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Building C

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing21%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure10%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.