Project Information

RERA Certificate No.
P51800002669
Registration No.
REA51800007071
Registration Date
2019-01-04
Developer
Bhaveshwar Properties Pvt Ltd Company
Architect
Daisaria Associates
Project Bank
STANDARD CHARTERED BANK
Proposed Possession
2019-11-30
Revised Possession
2019-11-30
Extended Possession
1900-01-01
Units Sold
0
Buildings
1
Project Area
483.85 sq.m
Total FSI
5369.37
Approved FSI
5369.37
MahaRERA QR
Neelkanth Enclave C Wing Arihant
MahaRERA — P51800002669
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors14
Sanctioned14
🅿️Closed Parking118
📅Completion2019-11-30

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
2 Bhk 82.55000305175781 0 0 0
0%
3 Bhk 104.69999694824219 0 0 0
0%
3 Bhk 104.77999877929688 0 0 0
0%
3 Bhk 108.0999984741211 0 0 0
0%

C Wing Arihant

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 82.55 11 7 4
64%
3 BHK 104.7 12 2 10
17%
3 BHK 104.78 12 6 6
50%
3 BHK 108.1 12 10 2
83%

Construction Progress

C Wing ARIHANT

Basement (if any)100%

C Wing Arihant

Excavation100%

C Wing ARIHANT

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

C Wing Arihant

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

C Wing ARIHANT

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

C Wing Arihant

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%

C Wing ARIHANT

Plinth100%
Podiums (if any) 100%

C Wing Arihant

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises87%

C Wing ARIHANT

Sanitary Fittings within the flats / premises87%
Slabs of Super Structure100%

C Wing Arihant

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

C Wing ARIHANT

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

C Wing Arihant

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space 100%
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station 100%
Energy management
Fire Protection And Fire Safety Requirements 100%
Landscaping & Tree Planting 100%
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP) 100%
Solid Waste Management And Disposal
Storm Water Drains 100%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water 100%
Water Conservation, Rain water Harvesting 100%
Water Supply 100%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.