📞 +91 98200 30685 ✉️
RERA: A51800043517

REDEVELOPMENT OF RAMESH MANDIR CHSL

by PRANAV CONSTRUCTIONS LIMITED Company
Certificate Signed P51800032468
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51800032468
Registration No.
REA51800100790
Registration Date
2022-01-04
Developer
PRANAV CONSTRUCTIONS LIMITED Company
Architect
Rasik P Hingoo And Associates
Project Bank
HDFC BANK
Proposed Possession
2025-04-30
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Units Sold
0
Buildings
1
Project Area
2366.10 sq.m
Total FSI
7013.11
Approved FSI
1119.60
MahaRERA QR
REDEVELOPMENT OF RAMESH MANDIR CHSL
MahaRERA — P51800032468
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors11
Sanctioned11
🚗Open Parking21
🅿️Closed Parking79
📅Completion2025-04-30

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1Bhk 33.709999084472656 0 0 0
0%
1Bhk 39.400001525878906 0 0 0
0%
1Bhk 40.099998474121094 0 0 0
0%
1Bhk 43.970001220703125 0 0 0
0%
1Bhk 45.880001068115234 0 0 0
0%
2Bhk 55.849998474121094 0 0 0
0%
2Bhk 59.310001373291016 0 0 0
0%
2Bhk 59.31999969482422 0 0 0
0%
2Bhk 59.869998931884766 0 0 0
0%
2Bhk 60.310001373291016 0 0 0
0%
2Bhk 61.58000183105469 0 0 0
0%
2Bhk 64.20999908447266 0 0 0
0%
3Bhk 65.58999633789062 0 0 0
0%
3Bhk 67.47000122070312 0 0 0
0%
3Bhk 69.1500015258789 0 0 0
0%
3Bhk 70.4000015258789 0 0 0
0%
3Bhk 71.29000091552734 0 0 0
0%
3Bhk 73.20999908447266 0 0 0
0%
3Bhk 77.25 0 0 0
0%
3Bhk 77.2699966430664 0 0 0
0%
3Bhk 82.12000274658203 0 0 0
0%
3Bhk 83.44000244140625 0 0 0
0%
3Bhk 83.4800033569336 0 0 0
0%
3Bhk 83.58000183105469 0 0 0
0%
3Bhk 83.61000061035156 0 0 0
0%
4Bhk 148.22999572753906 0 0 0
0%

Nirvana Residency

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 33.71 1 0 1
0%
1 BHK 39.4 2 0 2
0%
1 BHK 40.1 2 0 2
0%
1 BHK 43.97 2 0 2
0%
1 BHK 45.88 2 0 2
0%
2 BHK 55.85 1 0 1
0%
2 BHK 59.31 8 0 8
0%
2 BHK 59.32 9 0 9
0%
2 BHK 59.87 1 0 1
0%
2 BHK 60.31 3 0 3
0%
2 BHK 61.58 16 0 16
0%
2 BHK 64.21 7 0 7
0%
3 BHK 65.59 1 0 1
0%
3 BHK 67.47 4 0 4
0%
3 BHK 69.15 1 0 1
0%
3 BHK 70.4 1 0 1
0%
3 BHK 71.29 1 0 1
0%
3 BHK 73.21 1 0 1
0%
3 BHK 77.25 8 0 8
0%
3 BHK 77.27 2 0 2
0%
3 BHK 82.12 2 0 2
0%
3 BHK 83.44 5 0 5
0%
3 BHK 83.48 6 0 6
0%
3 BHK 83.58 3 0 3
0%
3 BHK 83.61 4 0 4
0%
4 BHK 148.23 2 0 2
0%

Construction Progress

NIRVANA RESIDENCY

Basement (if any)100%

Nirvana Residency

Excavation100%

NIRVANA RESIDENCY

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%

Nirvana Residency

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate50%

NIRVANA RESIDENCY

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises98%

Nirvana Residency

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises98%

NIRVANA RESIDENCY

Plinth100%
Podiums (if any) 0%

Nirvana Residency

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises5%

NIRVANA RESIDENCY

Sanitary Fittings within the flats / premises5%
Slabs of Super Structure100%

Nirvana Residency

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.98%

NIRVANA RESIDENCY

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks98%

Nirvana Residency

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing95%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station 25%
Energy management
Fire Protection And Fire Safety Requirements 80%
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP) 90%
Solid Waste Management And Disposal
Storm Water Drains 90%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting 80%
Water Supply 90%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.