📞 +91 98200 30685 ✉️
RERA: A51800043517

Sereno-B, Omkar International District

by Omkar Ventures Pvt. Ltd.
Kept in Abeyance P51800017695
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51800017695
Developer
Omkar Ventures Pvt. Ltd.
Project Bank
YES BANK LTD
Proposed Possession
2024-03-30
Revised Possession
1900-01-01
Extended Possession
2025-03-30
Buildings
3
Project Area
873.70 sq.m
Total FSI
14835.67
Litigations
⚠️ Yes
MahaRERA QR
Sereno-B, Omkar International District
MahaRERA — P51800017695
Scan to verify on MahaRERA portal

Wing-wise Details

⬇️Basements2
🅿️Closed Parking105
📅Completion2023-03-31
⬇️Basements2
🅿️Closed Parking107
📅Completion2023-03-31
⬇️Basements2
🅿️Closed Parking107
📅Completion2023-03-31

Apartment Configurations

Sereno-B3

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 33.67 62 48 14
77%
1 BHK 35.99 43 34 9
79%
SHOP 17.84 1 0 1
0%
SHOP 19.44 1 0 1
0%
SHOP 19.88 1 0 1
0%
SHOP 21.27 1 0 1
0%
SHOP 25.91 1 0 1
0%
SHOP 30.74 1 0 1
0%
SHOP 31.1 1 0 1
0%
SHOP 32.45 1 0 1
0%

Sereno-B4

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 33.67 44 32 12
73%
2 BHK 46.74 41 32 9
78%
SHOP 19.44 1 0 1
0%
SHOP 35.38 1 0 1
0%

Sereno-B5

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 33.67 66 50 16
76%
2 BHK 46.74 39 31 8
79%
SHOP 16.86 1 0 1
0%
SHOP 19.51 1 0 1
0%
SHOP 29.19 1 0 1
0%
SHOP 30.94 1 0 1
0%
SHOP 32.55 1 0 1
0%

Construction Progress

Sereno-B3

Excavation0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

Sereno-B4

Excavation0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

Sereno-B5

Excavation0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.