Project Information

RERA Certificate No.
P51800054289
Registration No.
REA51800151121
Registration Date
2024-01-15
Developer
OMKARA INFRATECH Others
Architect
Hasmukh Patel
Project Bank
AXIS BANK
Proposed Possession
2027-03-31
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Units Sold
0
Buildings
1
Project Area
535.70 sq.m
Total FSI
1588.37
Approved FSI
1588.37
MahaRERA QR
OMKARA UNCHAI
MahaRERA — P51800054289
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors10
Sanctioned10
🅿️Closed Parking18
📅Completion2027-03-31

Apartment Configurations

Omkara Unchai

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 47.5 2 0 2
0%
2 BHK 56.58 4 0 4
0%
2 BHK 59.86 4 0 4
0%
convenience shop 16.83 1 0 1
0%
convenience shop 18.65 1 0 1
0%
convenience shop 22.37 1 0 1
0%
existing member 31.9 1 0 1
0%
existing member 43.1 2 0 2
0%
existing member 46.34 2 0 2
0%
existing member 47.5 1 0 1
0%
existing member 56.58 5 0 5
0%
existing member 59.86 5 0 5
0%

Construction Progress

OMKARA UNCHAI

Basement (if any)100%

Omkara Unchai

Excavation100%

OMKARA UNCHAI

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Omkara Unchai

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

OMKARA UNCHAI

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%

Omkara Unchai

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises70%

OMKARA UNCHAI

Plinth100%
Podiums (if any) 0%

Omkara Unchai

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises15%

OMKARA UNCHAI

Sanitary Fittings within the flats / premises15%
Slabs of Super Structure100%

Omkara Unchai

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.40%

OMKARA UNCHAI

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%

Omkara Unchai

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.