Project Information

RERA Certificate No.
P51900009142
Registration No.
REA51900014209
Developer
Ornate Spaces Private Limited
Project Bank
HDFC Bank
Proposed Possession
2023-11-30
Revised Possession
2024-11-29
Extended Possession
1900-01-01
Buildings
2
Project Area
6629.18 sq.m
Total FSI
58650.30
Approved FSI
30712.83
MahaRERA QR
Grove Towers
MahaRERA — P51900009142
Scan to verify on MahaRERA portal

Wing-wise Details

⬇️Basements3
🅿️Closed Parking190
📅Completion2023-11-30
⬇️Basements3
🅿️Closed Parking667
📅Completion2023-11-30

Apartment Configurations

Tower 1

TypeCarpet (sq.ft)TotalBookedAvailableStatus
Type A60.381520152
0%
Type B71.9916016
0%
Type C97.5458058
0%

Tower 2

TypeCarpet (sq.ft)TotalBookedAvailableStatus
Commercial 1277.13101
0%
Type A100.3320812
40%
Type B101.73511041
20%
Type C106.8419910
47%
Type D107.7749445
8%
Type E143.5374866
11%
Type F161.19101
0%
Type G162.58303
0%
Type H190.45909
0%
Type I191.8423023
0%

Construction Progress

Tower 1

Excavation92%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

Tower 2

Excavation92%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.