RERA: A51800043517

Pushp Vinod-3

by Vas Infrastructure Ltd.
Kept in AbeyanceP51800003609

Project Information

RERA Certificate No.
P51800003609
Registration No.
REA51800017277
Developer
Vas Infrastructure Ltd.
Project Bank
Syndicate Bank
Proposed Possession
2015-12-15
Revised Possession
2021-12-15
Extended Possession
1900-01-01
Buildings
4
Project Area
2308.20 sq.m
Total FSI
9589.43
Approved FSI
4973.51
Litigations
⚠️ Yes
MahaRERA QR
Pushp Vinod-3
MahaRERA — P51800003609
Scan to verify on MahaRERA portal

Wing-wise Details

⬇️Basements1
🚗Open Parking12
🅿️Closed Parking36
📅Completion1900-01-01
📅Completion1900-01-01
📅Completion1900-01-01
📅Completion1900-01-01

Apartment Configurations

Phase 1

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK33.4111110
100%
1 BHK45.47440
100%
1 BHK47.55770
100%
1 BHK57.26550
100%
1 RK22.5440
100%
1 RK24.7611110
100%
1 RK26.33220
100%
1 RK27.96330
100%
1 RK28.84110
100%
1 RK32.310100
100%
1 RK35.75220
100%
1 RK42.18220
100%
1 Rk39.04440
100%

Phase 2

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK47.06101
0%
1 BHK53.03101
0%
1 BHK57.0101
0%
1 BHK59.78110
100%
1 BHK59.98211
50%
1 BHK60.89211
50%
1 BHK63.73110
100%
1 BHK67.89101
0%
1 BHK68.36101
0%
1 BHK71.12101
0%
1RK41.19101
0%
1RK52.82110
100%
1RK53.22101
0%
1RK53.38101
0%
1RK59.14101
0%
1RK59.38101
0%

Phase 3

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK33.34101
0%
1 BHK33.6101
0%
1 BHK36.6303
0%
1 BHK39.89202
0%
1 BHK64.42303
0%
2 BHK67.45303
0%
2 BHK68.6303
0%
3 BHK89.73101
0%
3 BHK92.36202
0%

Phase 4

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK36.6505
0%
1 BHK39.89505
0%
1 BHK64.42505
0%
2 BHK67.45505
0%
2 BHK68.6505
0%
3 BHK92.36505
0%

Construction Progress

Phase 1

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing100%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

Phase 2

Excavation0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

Phase 3

Excavation0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

Phase 4

Excavation0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station100%
Energy management
Fire Protection And Fire Safety Requirements100%
Landscaping & Tree Planting100%
Open Parking100%
Sewerage (Chamber, Lines, Septic Tank , STP)100%
Solid Waste Management And Disposal100%
Storm Water Drains100%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water100%
Water Conservation, Rain water Harvesting100%
Water Supply100%
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.