📞 +91 98200 30685 ✉️
RERA: A51800043517

Pushp Vinod-3

by Vas Infrastructure Ltd.
Kept in Abeyance P51800003609
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51800003609
Registration No.
REA51800017277
Developer
Vas Infrastructure Ltd.
Project Bank
Syndicate Bank
Proposed Possession
2015-12-15
Revised Possession
2021-12-15
Extended Possession
1900-01-01
Buildings
4
Project Area
2308.20 sq.m
Total FSI
9589.43
Approved FSI
4973.51
Litigations
⚠️ Yes
MahaRERA QR
Pushp Vinod-3
MahaRERA — P51800003609
Scan to verify on MahaRERA portal

Wing-wise Details

⬇️Basements1
🚗Open Parking12
🅿️Closed Parking36
📅Completion1900-01-01
📅Completion1900-01-01
📅Completion1900-01-01
📅Completion1900-01-01

Apartment Configurations

Phase 1

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 33.41 11 11 0
100%
1 BHK 45.47 4 4 0
100%
1 BHK 47.55 7 7 0
100%
1 BHK 57.26 5 5 0
100%
1 RK 22.5 4 4 0
100%
1 RK 24.76 11 11 0
100%
1 RK 26.33 2 2 0
100%
1 RK 27.96 3 3 0
100%
1 RK 28.84 1 1 0
100%
1 RK 32.3 10 10 0
100%
1 RK 35.75 2 2 0
100%
1 Rk 39.04 4 4 0
100%
1 RK 42.18 2 2 0
100%

Phase 2

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 47.06 1 0 1
0%
1 BHK 53.03 1 0 1
0%
1 BHK 57.0 1 0 1
0%
1 BHK 59.78 1 1 0
100%
1 BHK 59.98 2 1 1
50%
1 BHK 60.89 2 1 1
50%
1 BHK 63.73 1 1 0
100%
1 BHK 67.89 1 0 1
0%
1 BHK 68.36 1 0 1
0%
1 BHK 71.12 1 0 1
0%
1RK 41.19 1 0 1
0%
1RK 52.82 1 1 0
100%
1RK 53.22 1 0 1
0%
1RK 53.38 1 0 1
0%
1RK 59.14 1 0 1
0%
1RK 59.38 1 0 1
0%

Phase 3

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 33.34 1 0 1
0%
1 BHK 33.6 1 0 1
0%
1 BHK 36.6 3 0 3
0%
1 BHK 39.89 2 0 2
0%
1 BHK 64.42 3 0 3
0%
2 BHK 67.45 3 0 3
0%
2 BHK 68.6 3 0 3
0%
3 BHK 89.73 1 0 1
0%
3 BHK 92.36 2 0 2
0%

Phase 4

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 36.6 5 0 5
0%
1 BHK 39.89 5 0 5
0%
1 BHK 64.42 5 0 5
0%
2 BHK 67.45 5 0 5
0%
2 BHK 68.6 5 0 5
0%
3 BHK 92.36 5 0 5
0%

Construction Progress

Phase 1

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing100%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

Phase 2

Excavation0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

Phase 3

Excavation0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

Phase 4

Excavation0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station 100%
Energy management
Fire Protection And Fire Safety Requirements 100%
Landscaping & Tree Planting 100%
Open Parking 100%
Sewerage (Chamber, Lines, Septic Tank , STP) 100%
Solid Waste Management And Disposal 100%
Storm Water Drains 100%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water 100%
Water Conservation, Rain water Harvesting 100%
Water Supply 100%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.