📞 +91 98200 30685 ✉️
RERA: A51800043517

PYRAMID CENTRIA

by PYRAMID INFRATECH CO Partnership
Certificate Signed P51700052732
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700052732
Registration No.
REA51700145417
Registration Date
2023-09-22
Developer
PYRAMID INFRATECH CO Partnership
Architect
Destination Architecture Interior Designs
Project Bank
HDFC BANK
Proposed Possession
2028-12-31
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Total Units
320
Units Sold
119 (37%)
Buildings
3
Project Area
5935.59 sq.m
Total FSI
28872.05
Approved FSI
27920.36
MahaRERA QR
PYRAMID CENTRIA
MahaRERA — P51700052732
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors27
Sanctioned27
🏠Habitable20
🔢Total Units210
🏡Residential138
🏢Non-Residential72
⬇️Basements1
🅿️Closed Parking256
📅Completion2028-12-31
🏗️Proposed Floors27
Sanctioned27
🏠Habitable18
🔢Total Units92
🏡Residential92
⬇️Basements1
🅿️Closed Parking185
📅Completion2028-12-31
🏗️Proposed Floors5
Sanctioned5
🏠Habitable3
🔢Total Units18
🏡Residential18
⬇️Basements1
🅿️Closed Parking18
📅Completion2028-12-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1Bhk 42.439998626708984 0 0 0
0%
1Bhk 45.619998931884766 0 0 0
0%
1Bhk 46.66999816894531 0 0 0
0%
1Bhk 47.959999084472656 0 0 0
0%
1Bhk 54.59000015258789 0 0 0
0%
2Bhk 52.27000045776367 0 0 0
0%
2Bhk 52.529998779296875 0 0 0
0%
2Bhk 55.220001220703125 0 0 0
0%
2Bhk 56.709999084472656 0 0 0
0%
2Bhk 56.79999923706055 0 0 0
0%
2Bhk 67.93000030517578 0 0 0
0%
2Bhk 67.94000244140625 0 0 0
0%
2Bhk 68.02999877929688 0 0 0
0%
3Bhk 73.30999755859375 0 0 0
0%
3Bhk 73.44999694824219 0 0 0
0%
3Bhk 85.06999969482422 0 0 0
0%
3Bhk 89.08999633789062 0 0 0
0%
3Bhk 90.5199966430664 0 0 0
0%
3Bhk 97.23999786376953 0 0 0
0%
Office Space 20.100000381469727 0 0 0
0%
Office Space 20.43000030517578 0 0 0
0%
Office Space 20.440000534057617 0 0 0
0%
Office Space 20.6299991607666 0 0 0
0%
Office Space 20.770000457763672 0 0 0
0%
Office Space 20.93000030517578 0 0 0
0%
Office Space 20.940000534057617 0 0 0
0%
Office Space 21.110000610351562 0 0 0
0%
Office Space 22.440000534057617 0 0 0
0%
Office Space 22.450000762939453 0 0 0
0%
Office Space 32.93000030517578 0 0 0
0%
Office Space 33.18000030517578 0 0 0
0%
Office Space 36.83000183105469 0 0 0
0%
Office Space 36.88999938964844 0 0 0
0%
Office Space 39.849998474121094 0 0 0
0%
Office Space 40.0 0 0 0
0%
Office Space 40.0099983215332 0 0 0
0%
Office Space 42.380001068115234 0 0 0
0%
Office Space 42.540000915527344 0 0 0
0%
Office Space 42.54999923706055 0 0 0
0%
Office Space 50.599998474121094 0 0 0
0%
Office Space 75.93000030517578 0 0 0
0%
Office Space 110.37999725341797 0 0 0
0%
Office Space 142.75 0 0 0
0%
Shop 15.460000038146973 0 0 0
0%
Shop 20.760000228881836 0 0 0
0%
Shop 25.600000381469727 0 0 0
0%
Shop 26.3799991607666 0 0 0
0%
Shop 26.81999969482422 0 0 0
0%
Shop 27.030000686645508 0 0 0
0%
Shop 28.979999542236328 0 0 0
0%
Shop 32.36000061035156 0 0 0
0%
Shop 33.11000061035156 0 0 0
0%
Shop 34.81999969482422 0 0 0
0%
Shop 40.439998626708984 0 0 0
0%
Shop 42.47999954223633 0 0 0
0%
Shop 43.79999923706055 0 0 0
0%
Shop 45.9900016784668 0 0 0
0%
Shop 46.13999938964844 0 0 0
0%
Shop 46.150001525878906 0 0 0
0%
Shop 48.90999984741211 0 0 0
0%
Shop 49.06999969482422 0 0 0
0%
Shop 49.08000183105469 0 0 0
0%
Shop 51.099998474121094 0 0 0
0%
Shop 51.7599983215332 0 0 0
0%
Shop 52.97999954223633 0 0 0
0%
Shop 56.040000915527344 0 0 0
0%
Shop 58.400001525878906 0 0 0
0%
Shop 58.70000076293945 0 0 0
0%
Shop 92.41999816894531 0 0 0
0%

Pyramid Centria-A-Wing

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 52.53 1 0 1
0%
2 BHK 56.712 68 15 53
22%
2 BHK 67.935 33 21 12
64%
3 BHK 89.085 2 0 2
0%
3 BHK 90.515 16 7 9
44%
3 BHK 97.242 18 11 7
61%
Office space 20.1 1 0 1
0%
Office space 20.43 1 1 0
100%
Office space 20.435 2 0 2
0%
Office space 20.625 1 0 1
0%
Office space 20.77 1 0 1
0%
Office space 20.933 1 1 0
100%
Office space 20.937 1 0 1
0%
Office space 21.105 1 1 0
100%
Office space 22.44 1 1 0
100%
Office space 22.445 1 0 1
0%
Office space 32.933 1 0 1
0%
Office space 33.177 1 0 1
0%
Office space 36.826 1 0 1
0%
Office space 36.891 1 0 1
0%
Office space 39.848 3 3 0
100%
Office space 40.0 2 0 2
0%
Office space 40.005 2 1 1
50%
Office space 42.377 1 1 0
100%
Office space 42.378 2 2 0
100%
Office space 42.54 1 0 1
0%
Office space 42.545 2 0 2
0%
Office space 50.6 1 0 1
0%
Office space 75.934 1 1 0
100%
Office space 110.379 1 0 1
0%
Office space 142.752 1 0 1
0%
Shop 15.457 1 0 1
0%
Shop 20.759 2 0 2
0%
Shop 25.597 1 0 1
0%
Shop 26.378 1 0 1
0%
Shop 26.382 2 0 2
0%
Shop 26.815 1 0 1
0%
Shop 27.026 2 1 1
50%
Shop 27.031 1 0 1
0%
Shop 28.977 1 0 1
0%
Shop 32.359 1 0 1
0%
Shop 33.112 1 1 0
100%
Shop 34.819 1 0 1
0%
Shop 40.441 1 1 0
100%
Shop 42.481 1 0 1
0%
Shop 43.8 1 1 0
100%
Shop 45.99 4 4 0
100%
Shop 46.143 2 0 2
0%
Shop 46.147 2 1 1
50%
Shop 48.91 1 1 0
100%
Shop 49.072 2 0 2
0%
Shop 49.077 1 1 0
100%
Shop 51.1 2 2 0
100%
Shop 51.759 1 0 1
0%
Shop 52.984 1 0 1
0%
Shop 56.036 2 0 2
0%
Shop 58.4 1 1 0
100%
Shop 58.7 1 0 1
0%
Shop 92.422 1 1 0
100%

Pyramid Centria-B-Wing

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 55.215 6 0 6
0%
2 BHK 56.712 26 0 26
0%
2 BHK 56.802 1 1 0
100%
2 BHK 67.934 12 4 8
33%
2 BHK 68.025 1 0 1
0%
2 BHK 68.026 1 0 1
0%
3 BHK 73.313 1 0 1
0%
3 BHK 73.448 1 0 1
0%
3 BHK 85.072 18 0 18
0%
3 BHK 89.085 2 0 2
0%
3 BHK 90.515 16 5 11
31%
3 BHK 97.244 7 0 7
0%

Pyramid Centria-C-Wing Ews

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 42.44 3 0 3
0%
1 BHK 45.621 3 0 3
0%
1 BHK 46.67 3 0 3
0%
1 BHK 47.96 3 0 3
0%
1 BHK 54.594 3 0 3
0%
2 BHK 52.272 3 0 3
0%

Construction Progress

PYRAMID CENTRIA-A-WING

Basement (if any)75%

Pyramid Centria-A-Wing

Excavation100%

PYRAMID CENTRIA-A-WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Pyramid Centria-A-Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

PYRAMID CENTRIA-A-WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Pyramid Centria-A-Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing15%

PYRAMID CENTRIA-A-WING

Plinth75%
Podiums (if any) 0%

Pyramid Centria-A-Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

PYRAMID CENTRIA-A-WING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

Pyramid Centria-A-Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

PYRAMID CENTRIA-A-WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Pyramid Centria-A-Wing

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth50%
X number of Podiums0%
X number of Slabs of Super Structure0%

PYRAMID CENTRIA-B-WING

Basement (if any)100%

Pyramid Centria-B-Wing

Excavation100%

PYRAMID CENTRIA-B-WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Pyramid Centria-B-Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

PYRAMID CENTRIA-B-WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Pyramid Centria-B-Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing15%

PYRAMID CENTRIA-B-WING

Plinth100%
Podiums (if any) 0%

Pyramid Centria-B-Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

PYRAMID CENTRIA-B-WING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure8%

Pyramid Centria-B-Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

PYRAMID CENTRIA-B-WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Pyramid Centria-B-Wing

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth50%
X number of Podiums0%
X number of Slabs of Super Structure0%

PYRAMID CENTRIA-C-WING EWS

Basement (if any)100%

Pyramid Centria-C-Wing Ews

Excavation100%

PYRAMID CENTRIA-C-WING EWS

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Pyramid Centria-C-Wing Ews

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

PYRAMID CENTRIA-C-WING EWS

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Pyramid Centria-C-Wing Ews

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%

PYRAMID CENTRIA-C-WING EWS

Plinth100%
Podiums (if any) 0%

Pyramid Centria-C-Wing Ews

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

PYRAMID CENTRIA-C-WING EWS

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

Pyramid Centria-C-Wing Ews

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

PYRAMID CENTRIA-C-WING EWS

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Pyramid Centria-C-Wing Ews

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.