📞 +91 98200 30685 ✉️
RERA: A51800043517

N G ECLAT C WING PHASE I

by NARINDERPAL ROSHANLAL GUPTA Individual
Certificate Signed P51800000218
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51800000218
Registration No.
REA51800003127
Registration Date
2017-07-10
Developer
NARINDERPAL ROSHANLAL GUPTA Individual
Architect
Tarun H Motta
Project Bank
KOTAK MAHINDRA BANK LIMITED
Proposed Possession
2019-12-15
Revised Possession
2019-12-15
Extended Possession
1900-01-01
Units Sold
0
Buildings
1
Project Area
4328.60 sq.m
Total FSI
13911.66
Approved FSI
13911.66
MahaRERA QR
N G ECLAT C WING PHASE I
MahaRERA — P51800000218
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors43
Sanctioned43
⬇️Basements2
🚗Open Parking18
🅿️Closed Parking148
📅Completion1900-01-01

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1Bhktype1 58.5099983215332 0 0 0
0%
1Bhktype2 58.56999969482422 0 0 0
0%
1Bhktype3 59.209999084472656 0 0 0
0%
1Rktype1 38.29999923706055 0 0 0
0%
1Rktype2 40.18000030517578 0 0 0
0%
1Rktype4 35.400001525878906 0 0 0
0%
1Rktype5 32.150001525878906 0 0 0
0%
2Bhktype1 71.27999877929688 0 0 0
0%
Rktype3 39.0 0 0 0
0%
Shoptype1 92.31999969482422 0 0 0
0%
Shoptype2 47.13999938964844 0 0 0
0%
Shoptype3 20.3799991607666 0 0 0
0%
Shoptype4 40.380001068115234 0 0 0
0%

N G Eclat C Wing Phase I

Type Carpet (sq.ft) Total Booked Available Status
1 BHKTYPE1 58.51 8 0 8
0%
1 BHKTYPE2 58.57 19 0 19
0%
1 BHKTYPE3 59.21 3 0 3
0%
1RKTYPE1 38.3 69 0 69
0%
1RKTYPE2 40.18 7 0 7
0%
1RKTYPE4 35.4 19 0 19
0%
1RKTYPE5 32.15 1 0 1
0%
2 BHKTYPE1 71.28 74 0 74
0%
RKTYPE3 39.0 13 0 13
0%
SHOPTYPE1 92.32 1 0 1
0%
SHOPTYPE2 47.14 1 0 1
0%
SHOPTYPE3 20.38 1 0 1
0%
SHOPTYPE4 40.38 1 0 1
0%

Construction Progress

N G ECLAT C WING PHASE I

Basement (if any)100%

N G Eclat C Wing Phase I

Excavation100%

N G ECLAT C WING PHASE I

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

N G Eclat C Wing Phase I

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

N G ECLAT C WING PHASE I

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

N G Eclat C Wing Phase I

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing91%

N G ECLAT C WING PHASE I

Plinth100%
Podiums (if any) 100%

N G Eclat C Wing Phase I

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises10%

N G ECLAT C WING PHASE I

Sanitary Fittings within the flats / premises10%
Slabs of Super Structure100%

N G Eclat C Wing Phase I

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

N G ECLAT C WING PHASE I

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

N G Eclat C Wing Phase I

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station 100%
Energy management
Fire Protection And Fire Safety Requirements 100%
Landscaping & Tree Planting 100%
Open Parking 100%
Sewerage (Chamber, Lines, Septic Tank , STP) 100%
Solid Waste Management And Disposal 50%
Storm Water Drains 100%
Street Lighting 50%
Treatment And Disposal Of Sewage And Sullage Water 25%
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.