RERA: A51800043517

Runwal Elina

by Runwal Developers Private Limited Company
Certificate Signed P51800000072
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51800000072
Registration No.
REA51800001736
Registration Date
2019-12-17
Developer
Runwal Developers Private Limited Company
Architect
Pallavi Ganesh Matkari
Project Bank
INDUSIND BANK
Proposed Possession
2017-12-31
Revised Possession
2017-12-31
Extended Possession
2018-12-31
Units Sold
0
Buildings
4
Project Area
4539.50 sq.m
Total FSI
10768.80
Approved FSI
10300.05
MahaRERA QR
Runwal Elina
MahaRERA — P51800000072
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors18
Sanctioned18
⬇️Basements3
🚗Open Parking8
🅿️Closed Parking67
📅Completion2018-12-31
🏗️Proposed Floors18
Sanctioned18
⬇️Basements3
🚗Open Parking8
🅿️Closed Parking60
📅Completion2018-12-31
🏗️Proposed Floors18
Sanctioned18
⬇️Basements3
🚗Open Parking4
🅿️Closed Parking1
📅Completion2017-12-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1 Bhk 36.060001373291016 0 0 0
0%
2 Bhk 59.41999816894531 0 0 0
0%
2 Bhk 60.08000183105469 0 0 0
0%
2 Bhk 60.18000030517578 0 0 0
0%
2 Bhk 60.22999954223633 0 0 0
0%
2 Bhk 60.86000061035156 0 0 0
0%
2 Bhk 61.54999923706055 0 0 0
0%
2 Bhk 62.599998474121094 0 0 0
0%
2 Bhk 68.91999816894531 0 0 0
0%
2 Bhk 69.52999877929688 0 0 0
0%
2 Bhk 69.76000213623047 0 0 0
0%
2 Bhk 69.83999633789062 0 0 0
0%
2 Bhk 71.01000213623047 0 0 0
0%
2 Bhk 71.3499984741211 0 0 0
0%
2 Bhk 73.62999725341797 0 0 0
0%
2.5 Bhk 85.52999877929688 0 0 0
0%
2.5 Bhk 87.62000274658203 0 0 0
0%
3 Bhk 94.87999725341797 0 0 0
0%
3 Bhk 96.43000030517578 0 0 0
0%
3 Bhk 96.48999786376953 0 0 0
0%
3 Bhk 98.30000305175781 0 0 0
0%

Wing A

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 60.08 5 5 0
100%
2 BHK 60.86 5 5 0
100%
2 BHK 62.6 1 1 0
100%
2 BHK 68.92 2 2 0
100%
2 BHK 69.84 9 9 0
100%
2 BHK 71.01 3 3 0
100%
3 BHK 94.88 5 5 0
100%
3 BHK 96.43 8 7 1
88%
3 BHK 96.49 5 5 0
100%
3 BHK 98.3 8 7 1
88%

Wing B

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 59.42 1 1 0
100%
2 BHK 60.23 11 11 0
100%
2 BHK 61.55 2 2 0
100%
2 BHK 68.92 6 6 0
100%
2 BHK 69.76 6 3 3
50%
2.5 BHK 85.53 5 5 0
100%
2.5 BHK 87.62 18 13 5
72%

Wing C

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 36.06 1 1 0
100%
2 BHK 60.18 10 0 10
0%
2 BHK 69.53 3 0 3
0%
2 BHK 71.35 6 0 6
0%
2 BHK 73.63 6 0 6
0%

Construction Progress

Wing A

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Wing B

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Wing C

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing22%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor20%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure0%

RERA Registered Amenities

Aggregate area of recreational Open Space 100%
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station 100%
Energy management
Fire Protection And Fire Safety Requirements 100%
Landscaping & Tree Planting 100%
Open Parking 100%
Sewerage (Chamber, Lines, Septic Tank , STP) 100%
Solid Waste Management And Disposal 100%
Storm Water Drains 100%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water 100%
Water Conservation, Rain water Harvesting 100%
Water Supply 100%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.