Project Information

RERA Certificate No.
P51800001137
Registration No.
REA51800005094
Registration Date
2021-09-09
Developer
Wheelabrator Alloy Castings Limited Company
Architect
Aakar Architects & Consultants
Project Bank
HDFC BANK
Proposed Possession
2026-06-30
Revised Possession
2026-06-30
Extended Possession
1900-01-01
Units Sold
0
Buildings
3
Project Area
1831.43 sq.m
Total FSI
73617.27
Approved FSI
33557.73
MahaRERA QR
Runwal Forests Tower 9 - 11
MahaRERA — P51800001137
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors59
Sanctioned59
📅Completion2023-01-31
🏗️Proposed Floors59
Sanctioned59
📅Completion2023-01-31
🏗️Proposed Floors53
Sanctioned53
🅿️Closed Parking180
📅Completion2023-01-31

Apartment Configurations

Tower -10

Type Carpet (sq.ft) Total Booked Available Status
1.5bhk 43.21 108 93 15
86%
1.5bhk 49.7 103 96 7
93%
2 BHK 54.64 56 48 8
86%
2 BHK 54.82 49 45 4
92%
2 BHK 59.77 2 0 2
0%
2 BHK 60.0 110 103 7
94%

Tower-11

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 39.98 108 99 9
92%
1.5 BHK 47.26 90 84 6
93%
1.5 BHK 47.68 22 14 8
64%
2 BHK 57.19 104 83 21
80%
2 BHK 57.39 1 0 1
0%
2 BHK 57.94 48 46 2
96%
2 BHK 58.15 55 50 5
91%

Tower-9

Type Carpet (sq.ft) Total Booked Available Status
3 BHK 88.73 91 85 6
93%
3 BHK 99.87 1 0 1
0%
3 BHK 100.43 97 94 3
97%
3 BHK 102.52 1 0 1
0%
3 BHK 110.83 1 1 0
100%

Construction Progress

Tower -10

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.38%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate35%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.49%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises45%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises45%
Overall Percentage of Completion of the work done For the entire Building /Wing60%
Plinth100%
Podiums (if any) 90%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises2%
Sanitary Fittings within the flats / premises2%
Slabs of Super Structure93%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.25%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks32%
Stilt Floor85%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing25%
X number of Basement(s) and Plinth100%
X number of Podiums90%
X number of Slabs of Super Structure93%

Tower-11

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.25%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate20%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises35%
Overall Percentage of Completion of the work done For the entire Building /Wing55%
Plinth100%
Podiums (if any) 85%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises2%
Sanitary Fittings within the flats / premises2%
Slabs of Super Structure73%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.25%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks28%
Stilt Floor85%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing25%
X number of Basement(s) and Plinth100%
X number of Podiums85%
X number of Slabs of Super Structure73%

Tower-9

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.81%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate48%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.92%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises98%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises88%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises23%
Sanitary Fittings within the flats / premises60%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.65%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks76%
Stilt Floor95%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing45%
X number of Basement(s) and Plinth100%
X number of Podiums90%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Common Basement 30%
Common Car Parking
Community Buildings
Cricket pitch
Dedicated children play area
DG Backup for critical and Emergency Services
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Jogging / running track / Cycling Track
Landscaping & Tree Planting
Open air Gymnasium
Open Parking
Putting green
Senior citizen area
Sewerage (Chamber, Lines, Septic Tank , STP)
Skating rink
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Swimming pool 1
Swimming Pool No 1
Swimming Pool No 3
Treatment And Disposal Of Sewage And Sullage Water 20%
Water bodies
Water Conservation, Rain water Harvesting
Water Supply
Yoga Zone
Zen garden
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.