AXIS BANK
Proposed Possession
2022-12-30
Revised Possession
2022-12-30
Extended Possession
2024-12-30
Units Sold
0
Buildings
2
Project Area
14458.58 sq.m
Total FSI
78007.93
Approved FSI
76658.00
MahaRERA QR
Rustomjee Crown - Phase I
MahaRERA — P51900003268
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors71
Sanctioned71
⬇️Basements3
🅿️Closed Parking465
📅Completion2021-12-31
🏗️Proposed Floors71
Sanctioned71
⬇️Basements3
🅿️Closed Parking464
📅Completion2021-12-31

Apartment Configurations

Tower A

Type Carpet (sq.ft) Total Booked Available Status
AX01ST15 BHK 229.93 4 3 1
75%
AX01ST25 BHK 229.93 2 2 0
100%
AX01ST35 BHK 229.93 4 2 2
50%
AX01ST45 BHK 230.98 10 10 0
100%
AX01ST55 BHK 233.35 17 12 5
71%
AX01ST65 BHK 234.84 3 2 1
67%
AX02ST14 BHK 177.15 6 4 2
67%
AX02ST14 BHK 177.23 6 4 2
67%
AX02ST24 BHK 178.51 4 2 2
50%
AX02ST24 BHK 178.59 4 2 2
50%
AX02ST34 BHK 179.82 6 6 0
100%
AX02ST44 BHK 182.34 14 14 0
100%
AX02ST54 BHK 184.86 17 16 1
94%
AX02ST64 BHK 186.33 3 3 0
100%
AX03ST15 BHK 229.93 6 4 2
67%
AX03ST25 BHK 229.93 4 2 2
50%
AX03ST35 BHK 229.93 6 2 4
33%
AX03ST45 BHK 230.98 14 12 2
86%
AX03ST65 BHK 234.84 3 2 1
67%
AX04ST34 BHK 179.9 6 6 0
100%
AX04ST44 BHK 182.42 14 12 2
86%
AX04ST54 BHK 184.94 17 16 1
94%
AX04ST64 BHK 186.41 3 2 1
67%

Tower B

Type Carpet (sq.ft) Total Booked Available Status
BX01ST14 BHK 184.7 6 5 1
83%
BX01ST24 BHK 184.7 4 3 1
75%
BX01ST34 BHK 184.7 6 5 1
83%
BX01ST44 BHK 185.79 14 14 0
100%
BX01ST54 BHK 188.0 17 15 2
88%
BX01ST64 BHK 189.44 3 1 2
33%
BX02ST14 BHK 177.23 6 4 2
67%
BX02ST24 BHK 178.59 4 4 0
100%
BX02ST34 BHK 179.9 6 6 0
100%
BX02ST44 BHK 182.42 14 13 1
93%
BX02ST54 BHK 184.94 17 16 1
94%
BX02ST64 BHK 186.41 3 0 3
0%
BX03ST14 BHK 184.7 4 2 2
50%
BX03ST24 BHK 184.7 2 1 1
50%
BX03ST44 BHK 185.79 10 9 1
90%
BX03ST54 BHK 188.0 13 11 2
85%
BX03ST64 BHK 189.44 3 1 2
33%
BX04ST14 BHK 177.23 6 5 1
83%
BX04ST24 BHK 178.59 4 4 0
100%
BX04ST34 BHK 179.9 6 6 0
100%
BX04ST44 BHK 182.42 14 12 2
86%
BX04ST54 BHK 184.94 17 15 2
88%
BX04ST64 BHK 186.41 3 2 1
67%

Construction Progress

Tower A

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate86%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises85%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises16%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing98%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

Tower B

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.99%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate86%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises99%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises85%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises16%
Sanitary Fittings within the flats / premises97%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing98%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Changing Rooms
Children Play Area
Community Buildings
Double Height Sports Court
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Fitness Centre
In common with Phase II
Indoor Lap Pool
Jacuzzi Steam and Sauna
Landscaping & Tree Planting
Massage Room
Open Parking
Outdoor Swimming Pool
Sewerage (Chamber, Lines, Septic Tank , STP)
Society Amusement Area
Society Office
Solid Waste Management And Disposal
Sports and Recreation Activity Area
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Welfare Centre
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.