📞 +91 98200 30685 ✉️
RERA: A51800043517

Sanghvi S3 Ecocity Orchid

by Sanghvi Premises Pvt Ltd Company
Certificate Signed P51900008323
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51900008323
Registration No.
REA51900016892
Registration Date
2021-09-09
Developer
Sanghvi Premises Pvt Ltd Company
Architect
Bac Planners & Engineers Pvt Ltd
Project Bank
ICICI BANK LIMITED
Proposed Possession
2023-12-30
Revised Possession
2023-12-30
Extended Possession
2024-12-29
Units Sold
0
Buildings
2
Project Area
4010.00 sq.m
Total FSI
9022.50
Approved FSI
3393.76
MahaRERA QR
Sanghvi S3 Ecocity Orchid
MahaRERA — P51900008323
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors28
Sanctioned28
🚗Open Parking6
🅿️Closed Parking1
📅Completion2022-12-31
🏗️Proposed Floors28
Sanctioned28
🅿️Closed Parking1
📅Completion2022-12-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1 Bhk 29.979999542236328 0 0 0
0%
1 Bhk 30.09000015258789 0 0 0
0%
1 Bhk 31.920000076293945 0 0 0
0%
1 Bhk 31.979999542236328 0 0 0
0%
1 Bhk 33.400001525878906 0 0 0
0%
1Bhk 29.979999542236328 0 0 0
0%
1Bhk 30.09000015258789 0 0 0
0%
1Bhk 31.18000030517578 0 0 0
0%
1Bhk 31.920000076293945 0 0 0
0%
1Bhk 32.970001220703125 0 0 0
0%
1Bhk 37.540000915527344 0 0 0
0%
1Bhk 37.86000061035156 0 0 0
0%
1Bhk 38.470001220703125 0 0 0
0%
1Bhk 39.2400016784668 0 0 0
0%
1Bhk 39.27000045776367 0 0 0
0%
1Bhk 39.33000183105469 0 0 0
0%
1Bhk 39.4900016784668 0 0 0
0%
1Bhk 39.619998931884766 0 0 0
0%
1Bhk 39.88999938964844 0 0 0
0%
1Bhk 40.56999969482422 0 0 0
0%
1Bhk 40.79999923706055 0 0 0
0%
1Bhk 40.9900016784668 0 0 0
0%
1Bhk 41.970001220703125 0 0 0
0%

Orchid A

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 29.98 14 14 0
100%
1 BHK 30.09 14 14 0
100%
1 BHK 31.92 12 12 0
100%
1 BHK 31.98 14 14 0
100%
1 BHK 33.4 28 28 0
100%
1 BHK 37.86 11 10 1
91%
1 BHK 39.27 13 13 0
100%
1 BHK 39.33 12 12 0
100%
1 BHK 39.62 1 1 0
100%
1 BHK 40.57 13 13 0
100%
1 BHK 40.8 1 1 0
100%
1 BHK 40.99 12 10 2
83%
1 BHK 41.97 13 13 0
100%

Orchid B

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 29.98 28 28 0
100%
1 BHK 30.09 28 28 0
100%
1 BHK 31.18 14 14 0
100%
1 BHK 31.92 12 12 0
100%
1 BHK 32.97 14 14 0
100%
1 BHK 37.54 13 13 0
100%
1 BHK 37.86 11 10 1
91%
1 BHK 38.47 13 12 1
92%
1 BHK 39.24 13 12 1
92%
1 BHK 39.33 12 12 0
100%
1 BHK 39.49 13 12 1
92%
1 BHK 39.62 1 1 0
100%
1 BHK 39.89 13 11 2
85%

Construction Progress

Orchid A

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.60%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises85%
Overall Percentage of Completion of the work done For the entire Building /Wing69%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises70%
Sanitary Fittings within the flats / premises70%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing85%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Orchid B

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.60%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises85%
Overall Percentage of Completion of the work done For the entire Building /Wing69%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises70%
Sanitary Fittings within the flats / premises70%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing85%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings 100%
Electrical Meter Room, Sub-Station, Receiving Station 90%
Energy management
Fire Protection And Fire Safety Requirements 70%
Landscaping & Tree Planting 50%
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP) 90%
Solid Waste Management And Disposal
Storm Water Drains 60%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water 90%
Water Conservation, Rain water Harvesting 80%
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.