Project Information

RERA Certificate No.
P51800027913
Registration No.
REA51800081825
Registration Date
2021-09-08
Developer
Star Rise Partnership
Architect
Ellora Project Consultants Pvt. Ltd.
Project Bank
PUNJAB NATIONAL BANK
Proposed Possession
2024-06-30
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Units Sold
0
Buildings
3
Project Area
1998.13 sq.m
Total FSI
15091.01
MahaRERA QR
Sayba Residency
MahaRERA — P51800027913
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors19
Sanctioned19
📅Completion2023-12-31
🏗️Proposed Floors19
Sanctioned19
📅Completion2023-12-31
🏗️Proposed Floors19
Sanctioned19
📅Completion2023-12-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1Bhk 37.939998626708984 0 0 0
0%
1Bhk 40.9900016784668 0 0 0
0%
1Bhk 41.61000061035156 0 0 0
0%
1Bhk 49.63999938964844 0 0 0
0%
1Bhk 52.349998474121094 0 0 0
0%
2Bhk 47.9900016784668 0 0 0
0%
2Bhk 50.119998931884766 0 0 0
0%
2Bhk 50.130001068115234 0 0 0
0%
2Bhk 50.22999954223633 0 0 0
0%
2Bhk 50.45000076293945 0 0 0
0%
2Bhk 52.349998474121094 0 0 0
0%
2Bhk 54.529998779296875 0 0 0
0%
2Bhk 59.43000030517578 0 0 0
0%
2Bhk 61.38999938964844 0 0 0
0%
2Bhk 62.060001373291016 0 0 0
0%
2Bhk 73.44999694824219 0 0 0
0%
2Bhk 74.69000244140625 0 0 0
0%
2Bhk 75.95999908447266 0 0 0
0%

Sayba Residency - Wing A

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 50.12 50 44 6
88%
2 BHK 50.13 17 14 3
82%
2 BHK 50.23 17 15 2
88%
2 BHK 50.45 17 16 1
94%
2 BHK 52.35 2 2 0
100%
2 BHK 73.45 1 0 1
0%
2 BHK 74.69 1 0 1
0%

Sayba Residency - Wing B

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 40.99 69 39 30
57%
1 BHK 41.61 16 13 3
81%
1 BHK 52.35 18 11 7
61%
2 BHK 47.99 1 0 1
0%
2 BHK 59.43 1 0 1
0%

Sayba Residency - Wing C

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 37.94 2 0 2
0%
1 BHK 40.99 33 14 19
42%
1 BHK 41.61 15 10 5
67%
1 BHK 49.64 1 0 1
0%
2 BHK 52.35 18 13 5
72%
2 BHK 54.53 1 0 1
0%
2 BHK 59.43 1 0 1
0%
2 BHK 61.39 1 0 1
0%
2 BHK 62.06 1 0 1
0%
2 BHK 75.96 19 9 10
47%

Construction Progress

Sayba Residency - Wing A

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Sayba Residency - Wing B

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Sayba Residency - Wing C

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station 100%
Energy management
Fire Protection And Fire Safety Requirements 100%
Landscaping & Tree Planting 100%
Open Parking
Plinth 100%
Sewerage (Chamber, Lines, Septic Tank , STP) 100%
Solid Waste Management And Disposal
Storm Water Drains 100%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting 100%
Water Supply 100%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.