📞 +91 98200 30685 ✉️
RERA: A51800043517

Minerva

by Lokhandwala Kataria Construction Private Limited
Certificate Signed P51900008204
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51900008204
Registration No.
REA51900011270
Registration Date
2025-12-29
Developer
Lokhandwala Kataria Construction Private Limited
Architect
Amit
Project Bank
HDFC BANK
Proposed Possession
2023-12-30
Total Units
372
Units Sold
281 (76%)
Project Area
7907.90 sq.m
Total FSI
61271.00
Approved FSI
61271.00
MahaRERA QR
Minerva
MahaRERA — P51900008204
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors44
Sanctioned44
🏠Habitable26
🔢Total Units200
🏡Residential200
🏗️Proposed Floors26
Sanctioned26
🔢Total Units124
🏡Residential124
🏗️Proposed Floors14
Sanctioned14
🔢Total Units48
🏡Residential48

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
3.5 Bhk 191.19000244140625 0 0 0
0%
3Bhk Typ 1 122.81999969482422 0 0 0
0%
3Bhk Typ 2 132.57000732421875 0 0 0
0%
3Bhk Typ 4 112.77999877929688 0 0 0
0%
3Bhk Typ3 123.75 0 0 0
0%
4 Bhk Duplex Typ 4 280.19000244140625 0 0 0
0%
4 Bhk Duplex Typ 5 275.17999267578125 0 0 0
0%
4 Bhk Typ 3 171.39999389648438 0 0 0
0%
4 Bhk Typ 5 159.0500030517578 0 0 0
0%
4Bhk Duplex Typ 1 246.66000366210938 0 0 0
0%
4Bhk Typ 1 195.19000244140625 0 0 0
0%
4Bhk Typ 2 226.58999633789062 0 0 0
0%
4Bhk Typ 4 187.57000732421875 0 0 0
0%
4Bhk Typ 7 255.47999572753906 0 0 0
0%
4Bhk Typ3 198.44000244140625 0 0 0
0%
5 Bhk Duplex Typ 3 285.2099914550781 0 0 0
0%
5 Bhk Duplex Typ 6 270.8999938964844 0 0 0
0%

Construction Progress

MINERVA 1A 1-39

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.97%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

MINERVA 1B 40-65

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.98%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises60%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

MINERVA 1C 66-79

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.98%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises60%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.