📞 +91 98200 30685✉️
RERA: A51800043517

Shepherd Horizon

by Goodbuild India Private Limited
Certificate SignedP51800046622

Project Information

RERA Certificate No.
P51800046622
Registration No.
REA51800102904
Registration Date
2025-08-01
Developer
Goodbuild India Private Limited
Architect
K Arch
Project Bank
HDFC BANK
Proposed Possession
2025-07-31
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Total Units
78
Units Sold
26 (33%)
Buildings
1
Project Area
1168.86 sq.m
Total FSI
6328.17
Approved FSI
6328.17
MahaRERA QR
Shepherd Horizon
MahaRERA — P51800046622
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors25
Sanctioned25
🏠Habitable21
🔢Total Units78
🏡Residential78
🅿️Closed Parking111
📅Completion2025-07-31

Apartment Configurations

Varsova Andheri Vasundhara Chsl

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK37.1617116
6%
1 BHK39.5815015
0%
1 BHK41.71615
17%
1 BHK42.921019
10%
1 BHK46.82743
57%
1 BHK47.75101
0%
2 BHK64.1716
14%
2 BHK64.47725
29%
2 BHK66.8914410
29%

None

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1Bhk37.15999984741211000
0%
1Bhk39.58000183105469000
0%
1Bhk41.709999084472656000
0%
1Bhk42.91999816894531000
0%
1Bhk46.81999969482422000
0%
1Bhk47.75000
0%
2Bhk64.0999984741211000
0%
2Bhk64.47000122070312000
0%
2Bhk66.88999938964844000
0%

Construction Progress

VARSOVA ANDHERI VASUNDHARA CHSL

Basement (if any)100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%

Varsova Andheri Vasundhara Chsl

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.