📞 +91 98200 30685 ✉️
RERA: A51800043517

REDEVELOPMENT OF SHINING STAR CHSL

by PRANAV CONSTRUCTIONS LIMITED Company
Certificate Signed P51800053810
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51800053810
Registration No.
REA51800147018
Registration Date
2024-08-02
Developer
PRANAV CONSTRUCTIONS LIMITED Company
Architect
Rasik P Hingoo And Associates
Project Bank
HDFC BANK
Proposed Possession
2027-03-10
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Total Units
101
Units Sold
73 (72%)
Buildings
4
Project Area
2385.50 sq.m
Total FSI
8006.95
Approved FSI
5245.85
MahaRERA QR
REDEVELOPMENT OF SHINING STAR CHSL
MahaRERA — P51800053810
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors9
Sanctioned9
🔢Total Units32
🏡Residential32
🚗Open Parking1
🅿️Closed Parking36
📅Completion2027-10-03
🏗️Proposed Floors9
Sanctioned9
🏠Habitable8
🔢Total Units13
🏡Residential13
🚗Open Parking2
🅿️Closed Parking22
📅Completion2027-10-03
🏗️Proposed Floors9
Sanctioned9
🔢Total Units16
🏡Residential16
🚗Open Parking1
🅿️Closed Parking22
📅Completion2027-10-03
🏗️Proposed Floors9
Sanctioned9
🔢Total Units40
🏡Residential40
🚗Open Parking1
🅿️Closed Parking36
📅Completion2027-10-03

Apartment Configurations

Shining Star Chsl Wing C

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 65.47 8 8 0
100%
2 BHK 65.77 8 8 0
100%
2 BHK 67.76 16 16 0
100%

Shining Star Chsl- Wing A

Type Carpet (sq.ft) Total Booked Available Status
2 BHK REHAB 75.57 12 12 0
100%
5 BHK & more 174.24 1 0 1
0%

Shining Star Chsl- Wing B

Type Carpet (sq.ft) Total Booked Available Status
2 BHK REHAB 110.32 8 8 0
100%
3 BHK REHAB 110.36 8 8 0
100%

Shining Star Chsl- Wing D

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 53.37 8 8 0
100%
2 BHK 53.7 8 8 0
100%
2 BHK 65.77 8 8 0
100%
2 BHK 67.45 8 8 0
100%
2 BHK 75.47 8 8 0
100%

Construction Progress

SHINING STAR CHSL WING C

Basement (if any)0%

Shining Star Chsl Wing C

Excavation100%

SHINING STAR CHSL WING C

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%

Shining Star Chsl Wing C

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

SHINING STAR CHSL WING C

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%

Shining Star Chsl Wing C

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%

SHINING STAR CHSL WING C

Plinth100%
Podiums (if any) 0%

Shining Star Chsl Wing C

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

SHINING STAR CHSL WING C

Sanitary Fittings within the flats / premises30%
Slabs of Super Structure100%

Shining Star Chsl Wing C

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.25%

SHINING STAR CHSL WING C

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%

Shining Star Chsl Wing C

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure30%

SHINING STAR CHSL- WING A

Basement (if any)0%

Shining Star Chsl- Wing A

Excavation100%

SHINING STAR CHSL- WING A

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Shining Star Chsl- Wing A

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

SHINING STAR CHSL- WING A

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%

Shining Star Chsl- Wing A

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%

SHINING STAR CHSL- WING A

Plinth100%
Podiums (if any) 0%

Shining Star Chsl- Wing A

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

SHINING STAR CHSL- WING A

Sanitary Fittings within the flats / premises15%
Slabs of Super Structure95%

Shining Star Chsl- Wing A

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.25%

SHINING STAR CHSL- WING A

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%

Shining Star Chsl- Wing A

Stilt Floor85%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure30%

SHINING STAR CHSL- WING B

Basement (if any)0%

Shining Star Chsl- Wing B

Excavation100%

SHINING STAR CHSL- WING B

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Shining Star Chsl- Wing B

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

SHINING STAR CHSL- WING B

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%

Shining Star Chsl- Wing B

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%

SHINING STAR CHSL- WING B

Plinth100%
Podiums (if any) 0%

Shining Star Chsl- Wing B

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

SHINING STAR CHSL- WING B

Sanitary Fittings within the flats / premises15%
Slabs of Super Structure95%

Shining Star Chsl- Wing B

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.25%

SHINING STAR CHSL- WING B

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%

Shining Star Chsl- Wing B

Stilt Floor85%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure30%

SHINING STAR CHSL- WING D

Basement (if any)0%

Shining Star Chsl- Wing D

Excavation100%

SHINING STAR CHSL- WING D

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%

Shining Star Chsl- Wing D

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

SHINING STAR CHSL- WING D

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%

Shining Star Chsl- Wing D

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%

SHINING STAR CHSL- WING D

Plinth100%
Podiums (if any) 0%

Shining Star Chsl- Wing D

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

SHINING STAR CHSL- WING D

Sanitary Fittings within the flats / premises30%
Slabs of Super Structure100%

Shining Star Chsl- Wing D

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.25%

SHINING STAR CHSL- WING D

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%

Shining Star Chsl- Wing D

Stilt Floor90%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure30%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.