RERA: A51800043517

Shivdham

by Join Trak Infra Private Limited Company
Certificate SignedP51800034122

Project Information

RERA Certificate No.
P51800034122
Registration No.
REA51800105039
Registration Date
2022-03-24
Developer
Join Trak Infra Private Limited Company
Project Bank
AXIS BANK
Proposed Possession
2025-12-31
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Total Units
41
Units Sold
6 (15%)
Buildings
1
Project Area
1628.80 sq.m
Total FSI
5238.32
Approved FSI
5238.32
MahaRERA QR
Shivdham
MahaRERA — P51800034122
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors24
Sanctioned24
⬇️Basements1
🅿️Closed Parking91
📅Completion2025-12-31

Apartment Configurations

Shivdham

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK77.6303
0%
2 BHK77.8101
0%
2 BHK85.24101
0%
2 BHK95.54303
0%
2 BHK101.48303
0%
2 BHK REHAB72.86101
0%
2 BHK REHAB77.6303
0%
2 BHK REHAB77.8505
0%
2 BHK REHAB86.89101
0%
2 BHK REHAB101.48101
0%
3 BHK100.21303
0%
3 BHK106.68101
0%
3 BHK120.79110
100%
3 BHK133.72505
0%
3 BHK189.0101
0%
3 BHK REHAB97.15101
0%
3 BHK REHAB97.47101
0%
3 BHK REHAB98.64101
0%
3 BHK REHAB103.5101
0%
3 BHK REHAB106.49505
0%
3 BHK REHAB106.84505
0%
3 BHK REHAB112.36101
0%

Construction Progress

SHIVDHAM

Basement (if any)0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Shivdham

Excavation0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate75%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises85%
Overall Percentage of Completion of the work done For the entire Building /Wing85%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises20%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.90%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing80%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station30%
Energy management
Fire Protection And Fire Safety Requirements10%
Internal Roads & Footpaths
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.