Project Information

RERA Certificate No.
P51800008864
Registration No.
REA51800017729
Registration Date
2021-09-09
Developer
SHRADDHA LANDMARK PRIVATE LIMITED Company
Project Bank
HDFC BANK
Proposed Possession
2023-12-30
Revised Possession
2023-12-30
Extended Possession
2024-12-29
Units Sold
0
Buildings
8
Project Area
10442.00 sq.m
Total FSI
24057.02
Approved FSI
15653.02
MahaRERA QR
SHRADDHA EVOQUE
MahaRERA — P51800008864
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors24
Sanctioned24
🅿️Closed Parking17
📅Completion2022-12-31
🏗️Proposed Floors24
Sanctioned24
🅿️Closed Parking29
📅Completion2022-12-31
🏗️Proposed Floors24
Sanctioned24
🅿️Closed Parking25
📅Completion2022-12-31
🏗️Proposed Floors42
Sanctioned42
🅿️Closed Parking24
📅Completion2022-12-31
🏗️Proposed Floors24
Sanctioned24
🅿️Closed Parking24
📅Completion2022-12-31
🏗️Proposed Floors24
Sanctioned24
🅿️Closed Parking25
📅Completion2022-12-31
🏗️Proposed Floors8
Sanctioned8
🅿️Closed Parking2
📅Completion2022-12-31
🏗️Proposed Floors8
Sanctioned8
🅿️Closed Parking2
📅Completion2022-12-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1Bhk 34.0 0 0 0
0%
1Bhk 34.279998779296875 0 0 0
0%
2Bhk 48.59000015258789 0 0 0
0%
2Bhk 49.70000076293945 0 0 0
0%
Landowner 1Bhk 32.41999816894531 0 0 0
0%
Landowner 2Bhk 47.290000915527344 0 0 0
0%
Landowner Shop 9.90999984741211 0 0 0
0%
Landowner Shop 10.0600004196167 0 0 0
0%
Landowner Shop 11.4399995803833 0 0 0
0%
Landowner Shop 12.420000076293945 0 0 0
0%
Landowner Shop 12.600000381469727 0 0 0
0%
Landowner Shop 12.609999656677246 0 0 0
0%
Landowner Shop 13.050000190734863 0 0 0
0%
Landowner Shop 13.680000305175781 0 0 0
0%
Landowner Shop 16.719999313354492 0 0 0
0%
Landowner Shop 17.440000534057617 0 0 0
0%
Landowner Shop 17.90999984741211 0 0 0
0%
Landowner Shop 43.7599983215332 0 0 0
0%
Landowner Shop 44.0099983215332 0 0 0
0%
Landowner Shop 47.560001373291016 0 0 0
0%
Landowner Shop 61.72999954223633 0 0 0
0%
Na 0 0 0
0%
Oc Received 1Bhk 21.270000457763672 0 0 0
0%
Oc Received 1Bhk 32.41999816894531 0 0 0
0%
Oc Received 1Bhk 38.54999923706055 0 0 0
0%
Oc Received 1Bhk 47.290000915527344 0 0 0
0%
Oc Received 2Bhk 47.290000915527344 0 0 0
0%
Oc Received 2Bhk 54.06999969482422 0 0 0
0%
Oc Received Shop 12.050000190734863 0 0 0
0%
Oc Received Shop 13.680000305175781 0 0 0
0%
Oc Received Shop 14.5600004196167 0 0 0
0%
Oc Received Shop 15.680000305175781 0 0 0
0%
Oc Received Shop 47.79999923706055 0 0 0
0%
Shop No 28 12.729999542236328 0 0 0
0%
Shop No 29 12.819999694824219 0 0 0
0%
Shop No 30 10.40999984741211 0 0 0
0%
Shop No 31 17.559999465942383 0 0 0
0%
Shop No 32 38.09000015258789 0 0 0
0%
Shop No 33 10.130000114440918 0 0 0
0%
Shop No 34 21.549999237060547 0 0 0
0%
Shop No 35 20.25 0 0 0
0%

Sale Tower 1 Wing A

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 38.55 2 2 0
100%
1RK 21.27 20 20 0
100%
2 BHK 47.29 42 42 0
100%
SHOP NO 1 15.68 1 1 0
100%
SHOP NO 2 13.68 1 1 0
100%
SHOP NO 7 12.05 1 1 0
100%
SHOP NO 8 14.56 1 0 1
0%

Sale Tower 1 Wing B

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 32.42 53 51 2
96%
2 BHK 47.29 32 32 0
100%
3 BHK 54.07 1 1 0
100%

Sale Tower 1 Wing C

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 32.42 83 81 2
98%
SHOP NO 24 47.8 1 1 0
100%

Sale Tower 1 Wing D

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 34.0 78 77 1
99%
1 BHK 34.28 35 35 0
100%
2 BHK 48.59 78 27 51
35%
2 BHK 49.7 75 44 31
59%
SHOP NO 28 12.73 1 0 1
0%
SHOP NO 29 12.82 1 0 1
0%
SHOP NO 30 10.41 1 0 1
0%
SHOP NO 31 17.56 1 0 1
0%
SHOP NO 32 38.09 1 0 1
0%
SHOP NO 33 10.13 1 0 1
0%
SHOP NO 34 21.55 1 0 1
0%
SHOP NO 35 20.25 1 0 1
0%

Sale Tower 1 Wing E

Type Carpet (sq.ft) Total Booked Available Status
NA 0 0 0
0%

Sale Tower 1 Wing F

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 32.42 100 100 0
100%

Sale Tower 2

Type Carpet (sq.ft) Total Booked Available Status
COMMERCIAL 1 36.42 1 0 1
0%
COMMERCIAL 2 36.46 4 0 4
0%
COMMERCIAL 3 41.44 3 0 3
0%

Sale Tower 3

Type Carpet (sq.ft) Total Booked Available Status
COMMERCIAL 1 37.38 1 0 1
0%
COMMERCIAL 2 35.9 4 0 4
0%
COMMERCIAL 3 39.7 3 0 3
0%

Construction Progress

SALE TOWER 1 WING A

Basement (if any)100%

Sale Tower 1 Wing A

Excavation100%

SALE TOWER 1 WING A

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Sale Tower 1 Wing A

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

SALE TOWER 1 WING A

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Sale Tower 1 Wing A

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing100%

SALE TOWER 1 WING A

Plinth100%
Podiums (if any) 100%

Sale Tower 1 Wing A

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

SALE TOWER 1 WING A

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Sale Tower 1 Wing A

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

SALE TOWER 1 WING A

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Sale Tower 1 Wing A

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

SALE TOWER 1 WING B

Basement (if any)100%

Sale Tower 1 Wing B

Excavation100%

SALE TOWER 1 WING B

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Sale Tower 1 Wing B

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

SALE TOWER 1 WING B

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Sale Tower 1 Wing B

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing100%

SALE TOWER 1 WING B

Plinth100%
Podiums (if any) 100%

Sale Tower 1 Wing B

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

SALE TOWER 1 WING B

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Sale Tower 1 Wing B

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

SALE TOWER 1 WING B

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Sale Tower 1 Wing B

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

SALE TOWER 1 WING C

Basement (if any)100%

Sale Tower 1 Wing C

Excavation100%

SALE TOWER 1 WING C

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Sale Tower 1 Wing C

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

SALE TOWER 1 WING C

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Sale Tower 1 Wing C

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing100%

SALE TOWER 1 WING C

Plinth100%
Podiums (if any) 100%

Sale Tower 1 Wing C

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

SALE TOWER 1 WING C

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Sale Tower 1 Wing C

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

SALE TOWER 1 WING C

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Sale Tower 1 Wing C

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

SALE TOWER 1 WING D

Basement (if any)100%

Sale Tower 1 Wing D

Excavation100%

SALE TOWER 1 WING D

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.15%

Sale Tower 1 Wing D

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate59%

SALE TOWER 1 WING D

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.59%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises61%

Sale Tower 1 Wing D

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises61%
Overall Percentage of Completion of the work done For the entire Building /Wing68%

SALE TOWER 1 WING D

Plinth100%
Podiums (if any) 100%

Sale Tower 1 Wing D

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

SALE TOWER 1 WING D

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure85%

Sale Tower 1 Wing D

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.60%

SALE TOWER 1 WING D

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%

Sale Tower 1 Wing D

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing15%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure85%

SALE TOWER 1 WING E

Basement (if any)100%

Sale Tower 1 Wing E

Excavation100%

SALE TOWER 1 WING E

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Sale Tower 1 Wing E

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

SALE TOWER 1 WING E

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Sale Tower 1 Wing E

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing100%

SALE TOWER 1 WING E

Plinth100%
Podiums (if any) 100%

Sale Tower 1 Wing E

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

SALE TOWER 1 WING E

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Sale Tower 1 Wing E

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

SALE TOWER 1 WING E

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Sale Tower 1 Wing E

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

SALE TOWER 1 WING F

Basement (if any)100%

Sale Tower 1 Wing F

Excavation100%

SALE TOWER 1 WING F

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Sale Tower 1 Wing F

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

SALE TOWER 1 WING F

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Sale Tower 1 Wing F

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing100%

SALE TOWER 1 WING F

Plinth100%
Podiums (if any) 100%

Sale Tower 1 Wing F

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

SALE TOWER 1 WING F

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Sale Tower 1 Wing F

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

SALE TOWER 1 WING F

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Sale Tower 1 Wing F

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

SALE TOWER 2

Basement (if any)100%

Sale Tower 2

Excavation100%

SALE TOWER 2

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Sale Tower 2

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

SALE TOWER 2

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Sale Tower 2

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing100%

SALE TOWER 2

Plinth100%
Podiums (if any) 100%

Sale Tower 2

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

SALE TOWER 2

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Sale Tower 2

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

SALE TOWER 2

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Sale Tower 2

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

SALE TOWER 3

Basement (if any)100%

Sale Tower 3

Excavation100%

SALE TOWER 3

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Sale Tower 3

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

SALE TOWER 3

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Sale Tower 3

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing100%

SALE TOWER 3

Plinth100%
Podiums (if any) 100%

Sale Tower 3

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

SALE TOWER 3

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Sale Tower 3

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

SALE TOWER 3

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Sale Tower 3

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station 70%
Energy management
Fire Protection And Fire Safety Requirements 70%
Landscaping & Tree Planting 90%
Open Parking
OTHER
Pump Room 70%
Sewerage (Chamber, Lines, Septic Tank , STP) 90%
Solid Waste Management And Disposal
Storm Water Drains 90%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting 90%
Water Supply 90%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.