Shraddha Evoque

by Shraddha Landmark Private Limited Company
Certificate SignedP51800008864

Project Information

RERA Certificate No.
P51800008864
Registration No.
REA51800017729
Registration Date
2021-09-09
Developer
Shraddha Landmark Private Limited Company
Project Bank
HDFC BANK
Proposed Possession
2023-12-30
Revised Possession
2023-12-30
Extended Possession
2024-12-29
Units Sold
0
Buildings
8
Project Area
10442.00 sq.m
Total FSI
24057.02
Approved FSI
15653.02
MahaRERA QR
Shraddha Evoque
MahaRERA — P51800008864
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors24
Sanctioned24
🅿️Closed Parking17
📅Completion2022-12-31
🏗️Proposed Floors24
Sanctioned24
🅿️Closed Parking29
📅Completion2022-12-31
🏗️Proposed Floors24
Sanctioned24
🅿️Closed Parking25
📅Completion2022-12-31
🏗️Proposed Floors42
Sanctioned42
🅿️Closed Parking24
📅Completion2022-12-31
🏗️Proposed Floors24
Sanctioned24
🅿️Closed Parking24
📅Completion2022-12-31
🏗️Proposed Floors24
Sanctioned24
🅿️Closed Parking25
📅Completion2022-12-31
🏗️Proposed Floors8
Sanctioned8
🅿️Closed Parking2
📅Completion2022-12-31
🏗️Proposed Floors8
Sanctioned8
🅿️Closed Parking2
📅Completion2022-12-31

Apartment Configurations

None

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1Bhk34.0000
0%
1Bhk34.279998779296875000
0%
2Bhk48.59000015258789000
0%
2Bhk49.70000076293945000
0%
Landowner 1Bhk32.41999816894531000
0%
Landowner 2Bhk47.290000915527344000
0%
Landowner Shop9.90999984741211000
0%
Landowner Shop10.0600004196167000
0%
Landowner Shop11.4399995803833000
0%
Landowner Shop12.420000076293945000
0%
Landowner Shop12.600000381469727000
0%
Landowner Shop12.609999656677246000
0%
Landowner Shop13.050000190734863000
0%
Landowner Shop13.680000305175781000
0%
Landowner Shop16.719999313354492000
0%
Landowner Shop17.440000534057617000
0%
Landowner Shop17.90999984741211000
0%
Landowner Shop43.7599983215332000
0%
Landowner Shop44.0099983215332000
0%
Landowner Shop47.560001373291016000
0%
Landowner Shop61.72999954223633000
0%
Na000
0%
Oc Received 1Bhk21.270000457763672000
0%
Oc Received 1Bhk32.41999816894531000
0%
Oc Received 1Bhk38.54999923706055000
0%
Oc Received 1Bhk47.290000915527344000
0%
Oc Received 2Bhk47.290000915527344000
0%
Oc Received 2Bhk54.06999969482422000
0%
Oc Received Shop12.050000190734863000
0%
Oc Received Shop13.680000305175781000
0%
Oc Received Shop14.5600004196167000
0%
Oc Received Shop15.680000305175781000
0%
Oc Received Shop47.79999923706055000
0%
Shop No 2812.729999542236328000
0%
Shop No 2912.819999694824219000
0%
Shop No 3010.40999984741211000
0%
Shop No 3117.559999465942383000
0%
Shop No 3238.09000015258789000
0%
Shop No 3310.130000114440918000
0%
Shop No 3421.549999237060547000
0%
Shop No 3520.25000
0%

Sale Tower 1 Wing A

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK38.55220
100%
1RK21.2720200
100%
2 BHK47.2942420
100%
SHOP NO 115.68110
100%
SHOP NO 213.68110
100%
SHOP NO 712.05110
100%
SHOP NO 814.56101
0%

Sale Tower 1 Wing B

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK32.4253512
96%
2 BHK47.2932320
100%
3 BHK54.07110
100%

Sale Tower 1 Wing C

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK32.4283812
98%
SHOP NO 2447.8110
100%

Sale Tower 1 Wing D

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK34.078771
99%
1 BHK34.2835350
100%
2 BHK48.59782751
35%
2 BHK49.7754431
59%
SHOP NO 2812.73101
0%
SHOP NO 2912.82101
0%
SHOP NO 3010.41101
0%
SHOP NO 3117.56101
0%
SHOP NO 3238.09101
0%
SHOP NO 3310.13101
0%
SHOP NO 3421.55101
0%
SHOP NO 3520.25101
0%

Sale Tower 1 Wing E

TypeCarpet (sq.ft)TotalBookedAvailableStatus
NA000
0%

Sale Tower 1 Wing F

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK32.421001000
100%

Sale Tower 2

TypeCarpet (sq.ft)TotalBookedAvailableStatus
COMMERCIAL 136.42101
0%
COMMERCIAL 236.46404
0%
COMMERCIAL 341.44303
0%

Sale Tower 3

TypeCarpet (sq.ft)TotalBookedAvailableStatus
COMMERCIAL 137.38101
0%
COMMERCIAL 235.9404
0%
COMMERCIAL 339.7303
0%

Construction Progress

SALE TOWER 1 WING A

Basement (if any)100%

Sale Tower 1 Wing A

Excavation100%

SALE TOWER 1 WING A

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Sale Tower 1 Wing A

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

SALE TOWER 1 WING A

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Sale Tower 1 Wing A

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing100%

SALE TOWER 1 WING A

Plinth100%
Podiums (if any) 100%

Sale Tower 1 Wing A

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

SALE TOWER 1 WING A

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Sale Tower 1 Wing A

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

SALE TOWER 1 WING A

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Sale Tower 1 Wing A

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

SALE TOWER 1 WING B

Basement (if any)100%

Sale Tower 1 Wing B

Excavation100%

SALE TOWER 1 WING B

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Sale Tower 1 Wing B

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

SALE TOWER 1 WING B

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Sale Tower 1 Wing B

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing100%

SALE TOWER 1 WING B

Plinth100%
Podiums (if any) 100%

Sale Tower 1 Wing B

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

SALE TOWER 1 WING B

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Sale Tower 1 Wing B

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

SALE TOWER 1 WING B

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Sale Tower 1 Wing B

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

SALE TOWER 1 WING C

Basement (if any)100%

Sale Tower 1 Wing C

Excavation100%

SALE TOWER 1 WING C

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Sale Tower 1 Wing C

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

SALE TOWER 1 WING C

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Sale Tower 1 Wing C

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing100%

SALE TOWER 1 WING C

Plinth100%
Podiums (if any) 100%

Sale Tower 1 Wing C

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

SALE TOWER 1 WING C

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Sale Tower 1 Wing C

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

SALE TOWER 1 WING C

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Sale Tower 1 Wing C

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

SALE TOWER 1 WING D

Basement (if any)100%

Sale Tower 1 Wing D

Excavation100%

SALE TOWER 1 WING D

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.15%

Sale Tower 1 Wing D

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate59%

SALE TOWER 1 WING D

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.59%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises61%

Sale Tower 1 Wing D

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises61%
Overall Percentage of Completion of the work done For the entire Building /Wing68%

SALE TOWER 1 WING D

Plinth100%
Podiums (if any) 100%

Sale Tower 1 Wing D

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

SALE TOWER 1 WING D

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure85%

Sale Tower 1 Wing D

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.60%

SALE TOWER 1 WING D

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%

Sale Tower 1 Wing D

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing15%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure85%

SALE TOWER 1 WING E

Basement (if any)100%

Sale Tower 1 Wing E

Excavation100%

SALE TOWER 1 WING E

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Sale Tower 1 Wing E

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

SALE TOWER 1 WING E

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Sale Tower 1 Wing E

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing100%

SALE TOWER 1 WING E

Plinth100%
Podiums (if any) 100%

Sale Tower 1 Wing E

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

SALE TOWER 1 WING E

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Sale Tower 1 Wing E

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

SALE TOWER 1 WING E

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Sale Tower 1 Wing E

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

SALE TOWER 1 WING F

Basement (if any)100%

Sale Tower 1 Wing F

Excavation100%

SALE TOWER 1 WING F

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Sale Tower 1 Wing F

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

SALE TOWER 1 WING F

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Sale Tower 1 Wing F

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing100%

SALE TOWER 1 WING F

Plinth100%
Podiums (if any) 100%

Sale Tower 1 Wing F

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

SALE TOWER 1 WING F

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Sale Tower 1 Wing F

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

SALE TOWER 1 WING F

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Sale Tower 1 Wing F

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

SALE TOWER 2

Basement (if any)100%

Sale Tower 2

Excavation100%

SALE TOWER 2

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Sale Tower 2

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

SALE TOWER 2

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Sale Tower 2

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing100%

SALE TOWER 2

Plinth100%
Podiums (if any) 100%

Sale Tower 2

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

SALE TOWER 2

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Sale Tower 2

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

SALE TOWER 2

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Sale Tower 2

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

SALE TOWER 3

Basement (if any)100%

Sale Tower 3

Excavation100%

SALE TOWER 3

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Sale Tower 3

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

SALE TOWER 3

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Sale Tower 3

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing100%

SALE TOWER 3

Plinth100%
Podiums (if any) 100%

Sale Tower 3

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

SALE TOWER 3

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Sale Tower 3

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

SALE TOWER 3

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Sale Tower 3

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station70%
Energy management
Fire Protection And Fire Safety Requirements70%
Landscaping & Tree Planting90%
Open Parking
OTHER
Pump Room70%
Sewerage (Chamber, Lines, Septic Tank , STP)90%
Solid Waste Management And Disposal
Storm Water Drains90%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting90%
Water Supply90%
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.