📞 +91 98200 30685 ✉️
RERA: A51800043517

Shreedham Classic

by Shreedham Construction Private Limited Company
Certificate Signed P51800012234
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51800012234
Registration No.
REA51800012664
Registration Date
2017-09-01
Developer
Shreedham Construction Private Limited Company
Architect
Vishwas Satodia
Project Bank
HDFC BANK
Proposed Possession
2018-12-31
Revised Possession
2018-12-31
Extended Possession
2019-12-31
Units Sold
0
Buildings
1
Project Area
2728.51 sq.m
Total FSI
10652.64
Approved FSI
10652.64
MahaRERA QR
Shreedham Classic
MahaRERA — P51800012234
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors29
Sanctioned29
⬇️Basements1
🅿️Closed Parking1
📅Completion1900-01-01

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
2 Bhk 71.7300033569336 0 0 0
0%
2 Bhk 73.12000274658203 0 0 0
0%
2 Bhk 74.48999786376953 0 0 0
0%
3 Bhk 94.5 0 0 0
0%
3 Bhk 106.27999877929688 0 0 0
0%
3Bhk 129.60000610351562 0 0 0
0%
3Bhk 163.13999938964844 0 0 0
0%
4Bhk 171.61000061035156 0 0 0
0%
4Bhk 245.05999755859375 0 0 0
0%
A Office 14.210000038146973 0 0 0
0%
B Office 36.5099983215332 0 0 0
0%
C Office 46.72999954223633 0 0 0
0%
D Office 36.880001068115234 0 0 0
0%
Eoffice 16.719999313354492 0 0 0
0%
F Office 21.920000076293945 0 0 0
0%
G Office 33.06999969482422 0 0 0
0%
H Office 14.399999618530273 0 0 0
0%
I Office 17.84000015258789 0 0 0
0%
J Office 20.719999313354492 0 0 0
0%
K Office 53.5099983215332 0 0 0
0%
L Office 181.16000366210938 0 0 0
0%
Shop A 67.3499984741211 0 0 0
0%
Shop B 7.900000095367432 0 0 0
0%

Shreedham Classic

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 71.73 19 14 5
74%
2 BHK 73.12 19 14 5
74%
2 BHK 74.49 17 12 5
71%
3 BHK 94.5 16 10 6
62%
3 BHK 106.28 16 13 3
81%
3 BHK 129.6 1 1 0
100%
3 BHK 163.14 1 1 0
100%
4 BHK 171.61 2 0 2
0%
4 BHK 245.06 2 0 2
0%
A OFFICE 14.21 4 1 3
25%
B OFFICE 36.51 2 2 0
100%
C OFFICE 46.73 2 2 0
100%
D OFFICE 36.88 2 1 1
50%
EOFFICE 16.72 2 1 1
50%
F OFFICE 21.92 2 0 2
0%
G OFFICE 33.07 1 0 1
0%
H OFFICE 14.4 2 0 2
0%
I OFFICE 17.84 2 0 2
0%
J OFFICE 20.72 2 0 2
0%
K OFFICE 53.51 1 0 1
0%
L OFFICE 181.16 1 0 1
0%
Shop A 67.35 1 0 1
0%
Shop B 7.9 1 0 1
0%

Construction Progress

Shreedham Classic

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises97%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises97%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises97%
Sanitary Fittings within the flats / premises97%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space 90%
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station 100%
Energy management 50%
Fire Protection And Fire Safety Requirements 90%
Landscaping & Tree Planting 75%
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP) 100%
Solid Waste Management And Disposal 100%
Storm Water Drains 50%
Street Lighting 100%
Treatment And Disposal Of Sewage And Sullage Water 100%
Water Conservation, Rain water Harvesting 100%
Water Supply 90%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.