📞 +91 98200 30685 ✉️
RERA: A51800043517

ShreejiAikyam

by Rushabh Developers Partnership
Certificate Signed P51800051233
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51800051233
Registration No.
REA51800134886
Registration Date
2023-06-08
Developer
Rushabh Developers Partnership
Project Bank
AU SMALL FINANCE BANK LIMITED
Proposed Possession
2028-12-31
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Total Units
437
Units Sold
192 (44%)
Buildings
4
Project Area
10269.53 sq.m
Total FSI
48079.84
Approved FSI
2963.18
MahaRERA QR
ShreejiAikyam
MahaRERA — P51800051233
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors45
Sanctioned45
🏠Habitable33
🔢Total Units188
🏡Residential188
⬇️Basements1
🅿️Closed Parking17
📅Completion2028-12-31
🏗️Proposed Floors45
Sanctioned45
🏠Habitable33
🔢Total Units106
🏡Residential94
🏢Non-Residential12
⬇️Basements1
🅿️Closed Parking7
📅Completion2028-12-31
🏗️Proposed Floors10
Sanctioned10
🏠Habitable8
🔢Total Units143
🏢Non-Residential143

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
2Bhk 67.63999938964844 0 0 0
0%
2Bhk 67.6500015258789 0 0 0
0%
2Bhk 67.75 0 0 0
0%
2Bhk 76.62999725341797 0 0 0
0%
3Bhk 90.86000061035156 0 0 0
0%
3Bhk 104.73999786376953 0 0 0
0%
3Bhk 119.69000244140625 0 0 0
0%
3Bhk 1119.6800537109375 0 0 0
0%
4Bhk 164.27999877929688 0 0 0
0%
Office Space 26.75 0 0 0
0%
Office Space 27.389999389648438 0 0 0
0%
Office Space 27.40999984741211 0 0 0
0%
Office Space 29.5 0 0 0
0%
Office Space 30.59000015258789 0 0 0
0%
Office Space 32.58000183105469 0 0 0
0%
Office Space 32.630001068115234 0 0 0
0%
Office Space 35.150001525878906 0 0 0
0%
Office Space 49.93000030517578 0 0 0
0%
Office Space 51.08000183105469 0 0 0
0%
Office Space 55.810001373291016 0 0 0
0%

Shreeji Aikyam Wing A

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 59.84 8 0 8
0%
3 BHK 80.31 2 0 2
0%
3 BHK 85.86 2 0 2
0%
Office space 31.29 6 0 6
0%
Shop 45.29 1 0 1
0%

Shreeji Aikyam Wing B

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 59.84 3 0 3
0%
2 BHK 60.4 2 0 2
0%
3 BHK 80.31 1 0 1
0%
3 BHK 88.76 1 0 1
0%
3 BHK 92.68 1 0 1
0%

Construction Progress

Shreeji Aikyam Wing A

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 0%

Shreeji Aikyam Wing B

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 0%

Shreeji Aikyam Wing C

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 0%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.