Project Information

RERA Certificate No.
P51900030966
Developer
Sumit Matunga Builders Private Limited
Project Bank
HDFC
Proposed Possession
2024-12-31
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Buildings
2
Project Area
2081.03 sq.m
Total FSI
8791.14
MahaRERA QR
Sumit Atulyam
MahaRERA — P51900030966
Scan to verify on MahaRERA portal

Wing-wise Details

⬇️Basements1
🅿️Closed Parking95
📅Completion2024-12-31
🅿️Closed Parking20
📅Completion2024-12-31

Apartment Configurations

Sumit Atulyam Phase I Wing A Wing And Wing B Upto

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 62.24 8 7 1
88%
2 BHK 77.2 10 9 1
90%
3 BHK 106.04 14 9 5
64%
3 BHK 111.3 1 1 0
100%
Additional mem area 3.99 2 2 0
100%
Additional mem area 5.3 4 4 0
100%
Additional mem area 13.66 1 1 0
100%

Sumit Atulyam Phase Ii - Wing B, 18Th To 21St Flo

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 59.74 3 3 0
100%

Construction Progress

Sumit Atulyam Phase I Wing A Wing And Wing B Upto

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate30%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises80%
Overall Percentage of Completion of the work done For the entire Building /Wing82%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises50%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.85%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing75%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

Sumit Atulyam Phase Ii - Wing B, 18Th To 21St Flo

Excavation0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate50%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises25%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.50%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing70%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station 20%
Energy management
Fire Protection And Fire Safety Requirements 60%
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting 50%
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.