📞 +91 98200 30685 ✉️
RERA: A51800043517

Sunteck West World 2, Tivri, Naigaon East

by Sunteck Realty Limited Company
Certificate Signed P99000017627
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P99000017627
Registration No.
REA99000042310
Registration Date
2021-09-09
Developer
Sunteck Realty Limited Company
Architect
Vivek Bhole Architects Pvt. Ltd
Project Bank
AXIS BANK
Proposed Possession
2023-12-30
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Units Sold
0
Buildings
2
Project Area
9639.17 sq.m
Total FSI
30276.77
Approved FSI
30276.77
MahaRERA QR
Sunteck West World 2, Tivri, Naigaon East
MahaRERA — P99000017627
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors24
Sanctioned24
⬇️Basements1
📅Completion2022-12-31
🏗️Proposed Floors23
Sanctioned23
📅Completion2022-12-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1 Bhk 26.459999084472656 0 0 0
0%
1Bhk 26.459999084472656 0 0 0
0%
2 Bhk 41.7599983215332 0 0 0
0%
2Bhk 41.7599983215332 0 0 0
0%
Shop-10 76.66999816894531 0 0 0
0%
Shop-11 91.45999908447266 0 0 0
0%
Shop-12 77.16999816894531 0 0 0
0%
Shop-13 84.4800033569336 0 0 0
0%
Shop-14 76.0 0 0 0
0%
Shop-15 496.17999267578125 0 0 0
0%
Shop-16 76.0 0 0 0
0%
Shop-17 84.48999786376953 0 0 0
0%
Shop-18 77.16999816894531 0 0 0
0%
Shop-19 91.45999908447266 0 0 0
0%
Shop-20 76.66999816894531 0 0 0
0%
Shop-21 92.44999694824219 0 0 0
0%
Shop-9 93.01000213623047 0 0 0
0%
Shop1 496.17999267578125 0 0 0
0%
Shop2 76.0 0 0 0
0%
Shop3 84.4800033569336 0 0 0
0%
Shop4 77.16999816894531 0 0 0
0%
Shop5 91.45999908447266 0 0 0
0%
Shop6 76.66999816894531 0 0 0
0%
Shop7 93.01000213623047 0 0 0
0%
Shop8sma 2551.330078125 0 0 0
0%

Building No 6

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 26.46 241 217 24
90%
2 BHK 41.76 127 124 3
98%
Shop1 496.18 1 0 1
0%
Shop2 76.0 1 1 0
100%
Shop3 84.48 1 1 0
100%
Shop4 77.17 1 1 0
100%
Shop5 91.46 1 1 0
100%
Shop6 76.67 1 1 0
100%
Shop7 93.01 1 1 0
100%
Shop8SMA 2551.33 1 1 0
100%

Building No 7

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 26.46 234 228 6
97%
2 BHK 41.76 118 120 -2
102%
Shop-10 76.67 1 1 0
100%
Shop-11 91.46 1 1 0
100%
Shop-12 77.17 1 1 0
100%
Shop-13 84.48 1 1 0
100%
Shop-14 76.0 1 1 0
100%
Shop-15 496.18 1 0 1
0%
Shop-16 76.0 1 1 0
100%
Shop-17 84.49 1 0 1
0%
Shop-18 77.17 1 0 1
0%
Shop-19 91.46 1 0 1
0%
Shop-20 76.67 1 0 1
0%
Shop-21 92.45 1 0 1
0%
Shop-9 93.01 1 1 0
100%

Construction Progress

Building No 6

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Building No 7

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings 100%
Electrical Meter Room, Sub-Station, Receiving Station 100%
Energy management 100%
Fire Protection And Fire Safety Requirements 100%
Landscaping & Tree Planting 100%
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP) 100%
Solid Waste Management And Disposal 100%
Storm Water Drains 100%
Street Lighting 100%
Treatment And Disposal Of Sewage And Sullage Water 100%
Water Conservation, Rain water Harvesting 100%
Water Supply 100%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.