📞 +91 98200 30685✉️
RERA: A51800043517

Sunteck West World 2, Tivri, Naigaon East

by Sunteck Realty Limited Company
Certificate SignedP99000017627

Project Information

RERA Certificate No.
P99000017627
Registration No.
REA99000042310
Registration Date
2021-09-09
Developer
Sunteck Realty Limited Company
Architect
Vivek Bhole Architects Pvt. Ltd
Project Bank
AXIS BANK
Proposed Possession
2023-12-30
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Units Sold
0
Buildings
2
Project Area
9639.17 sq.m
Total FSI
30276.77
Approved FSI
30276.77
MahaRERA QR
Sunteck West World 2, Tivri, Naigaon East
MahaRERA — P99000017627
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors24
Sanctioned24
⬇️Basements1
📅Completion2022-12-31
🏗️Proposed Floors23
Sanctioned23
📅Completion2022-12-31

Apartment Configurations

None

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 Bhk26.459999084472656000
0%
1Bhk26.459999084472656000
0%
2 Bhk41.7599983215332000
0%
2Bhk41.7599983215332000
0%
Shop-1076.66999816894531000
0%
Shop-1191.45999908447266000
0%
Shop-1277.16999816894531000
0%
Shop-1384.4800033569336000
0%
Shop-1476.0000
0%
Shop-15496.17999267578125000
0%
Shop-1676.0000
0%
Shop-1784.48999786376953000
0%
Shop-1877.16999816894531000
0%
Shop-1991.45999908447266000
0%
Shop-2076.66999816894531000
0%
Shop-2192.44999694824219000
0%
Shop-993.01000213623047000
0%
Shop1496.17999267578125000
0%
Shop276.0000
0%
Shop384.4800033569336000
0%
Shop477.16999816894531000
0%
Shop591.45999908447266000
0%
Shop676.66999816894531000
0%
Shop793.01000213623047000
0%
Shop8sma2551.330078125000
0%

Building No 6

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK26.4624121724
90%
2 BHK41.761271243
98%
Shop1496.18101
0%
Shop276.0110
100%
Shop384.48110
100%
Shop477.17110
100%
Shop591.46110
100%
Shop676.67110
100%
Shop793.01110
100%
Shop8SMA2551.33110
100%

Building No 7

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK26.462342286
97%
2 BHK41.76118120-2
102%
Shop-1076.67110
100%
Shop-1191.46110
100%
Shop-1277.17110
100%
Shop-1384.48110
100%
Shop-1476.0110
100%
Shop-15496.18101
0%
Shop-1676.0110
100%
Shop-1784.49101
0%
Shop-1877.17101
0%
Shop-1991.46101
0%
Shop-2076.67101
0%
Shop-2192.45101
0%
Shop-993.01110
100%

Construction Progress

Building No 6

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Building No 7

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings100%
Electrical Meter Room, Sub-Station, Receiving Station100%
Energy management100%
Fire Protection And Fire Safety Requirements100%
Landscaping & Tree Planting100%
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)100%
Solid Waste Management And Disposal100%
Storm Water Drains100%
Street Lighting100%
Treatment And Disposal Of Sewage And Sullage Water100%
Water Conservation, Rain water Harvesting100%
Water Supply100%
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.