📞 +91 98200 30685 ✉️
RERA: A51800043517

Suraksha Smart City - Phase I

by Conceptual Advisory Services LLP Partnership
Certificate Signed P99000023396
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P99000023396
Registration No.
REA99000065878
Registration Date
2023-01-30
Developer
Conceptual Advisory Services LLP Partnership
Architect
Sanat Mehta
Project Bank
ICICI BANK LIMITED
Proposed Possession
2024-12-30
Revised Possession
1900-01-01
Extended Possession
2026-12-31
Units Sold
0
Buildings
10
Project Area
18133.69 sq.m
Total FSI
209650.37
Approved FSI
209650.37
MahaRERA QR
Suraksha Smart City - Phase I
MahaRERA — P99000023396
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors25
Sanctioned25
🅿️Closed Parking1
📅Completion2024-06-30
🏗️Proposed Floors25
Sanctioned25
🅿️Closed Parking1
📅Completion2024-06-30
🏗️Proposed Floors25
Sanctioned25
🅿️Closed Parking1
📅Completion2024-06-30
🏗️Proposed Floors25
Sanctioned25
🅿️Closed Parking1
📅Completion2024-06-30
🏗️Proposed Floors25
Sanctioned25
🅿️Closed Parking118
📅Completion2023-12-31
🏗️Proposed Floors25
Sanctioned25
🅿️Closed Parking92
📅Completion2023-12-31
🏗️Proposed Floors25
Sanctioned25
🅿️Closed Parking96
📅Completion2023-12-31
🏗️Proposed Floors25
Sanctioned25
🅿️Closed Parking100
📅Completion2023-12-31
🏗️Proposed Floors25
Sanctioned25
🅿️Closed Parking60
📅Completion2024-06-30
🏗️Proposed Floors25
Sanctioned25
🅿️Closed Parking1
📅Completion2024-06-30

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1Bhk 26.31999969482422 0 0 0
0%
1Bhk 26.360000610351562 0 0 0
0%
1Bhk 26.43000030517578 0 0 0
0%
Shop 13.039999961853027 0 0 0
0%
Shop 14.0 0 0 0
0%
Shop 14.109999656677246 0 0 0
0%
Shop 14.289999961853027 0 0 0
0%
Shop 14.3100004196167 0 0 0
0%
Shop 14.5 0 0 0
0%
Shop 14.649999618530273 0 0 0
0%
Shop 14.65999984741211 0 0 0
0%
Shop 14.670000076293945 0 0 0
0%
Shop 14.680000305175781 0 0 0
0%
Shop 14.720000267028809 0 0 0
0%
Shop 14.920000076293945 0 0 0
0%
Shop 14.930000305175781 0 0 0
0%
Shop 14.960000038146973 0 0 0
0%
Shop 14.970000267028809 0 0 0
0%
Shop 14.989999771118164 0 0 0
0%
Shop 15.039999961853027 0 0 0
0%
Shop 15.0600004196167 0 0 0
0%
Shop 15.100000381469727 0 0 0
0%
Shop 15.109999656677246 0 0 0
0%
Shop 15.140000343322754 0 0 0
0%
Shop 15.15999984741211 0 0 0
0%
Shop 15.170000076293945 0 0 0
0%
Shop 15.180000305175781 0 0 0
0%
Shop 15.5600004196167 0 0 0
0%
Shop 15.569999694824219 0 0 0
0%
Shop 15.579999923706055 0 0 0
0%
Shop 15.65999984741211 0 0 0
0%
Shop 15.6899995803833 0 0 0
0%
Shop 15.739999771118164 0 0 0
0%
Shop 15.760000228881836 0 0 0
0%
Shop 15.779999732971191 0 0 0
0%
Shop 15.8100004196167 0 0 0
0%
Shop 16.170000076293945 0 0 0
0%
Shop 16.190000534057617 0 0 0
0%
Shop 16.25 0 0 0
0%
Shop 16.31999969482422 0 0 0
0%
Shop 16.34000015258789 0 0 0
0%
Shop 16.360000610351562 0 0 0
0%
Shop 16.389999389648438 0 0 0
0%
Shop 16.399999618530273 0 0 0
0%
Shop 16.40999984741211 0 0 0
0%
Shop 16.420000076293945 0 0 0
0%
Shop 16.43000030517578 0 0 0
0%
Shop 16.440000534057617 0 0 0
0%
Shop 16.649999618530273 0 0 0
0%
Shop 16.65999984741211 0 0 0
0%
Shop 16.670000076293945 0 0 0
0%
Shop 16.860000610351562 0 0 0
0%
Shop 16.920000076293945 0 0 0
0%
Shop 17.139999389648438 0 0 0
0%
Shop 17.149999618530273 0 0 0
0%
Shop 17.8799991607666 0 0 0
0%
Shop 18.15999984741211 0 0 0
0%
Shop 19.65999984741211 0 0 0
0%
Shop 20.899999618530273 0 0 0
0%
Shop 20.920000076293945 0 0 0
0%
Shop 20.93000030517578 0 0 0
0%
Shop 21.06999969482422 0 0 0
0%
Shop 21.079999923706055 0 0 0
0%
Shop 21.15999984741211 0 0 0
0%
Shop 21.170000076293945 0 0 0
0%
Shop 23.229999542236328 0 0 0
0%
Shop 23.239999771118164 0 0 0
0%
Shop 23.25 0 0 0
0%
Shop 25.829999923706055 0 0 0
0%

Building No 10

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 26.32 632 0 632
0%

Building No 14

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 26.43 632 390 242
62%
Shop 14.31 1 0 1
0%
Shop 14.68 1 0 1
0%
Shop 15.06 1 0 1
0%
Shop 15.11 1 0 1
0%
Shop 15.17 1 0 1
0%
Shop 15.58 2 0 2
0%
Shop 15.69 1 0 1
0%
Shop 15.76 1 0 1
0%
Shop 15.81 1 0 1
0%
Shop 16.32 1 0 1
0%
Shop 16.39 1 0 1
0%
Shop 16.42 2 0 2
0%
Shop 16.44 1 0 1
0%
Shop 16.67 3 0 3
0%
Shop 17.15 1 0 1
0%
Shop 19.66 1 0 1
0%
Shop 20.92 1 0 1
0%
Shop 21.17 1 0 1
0%
Shop 23.24 1 0 1
0%
Shop 23.25 2 0 2
0%

Building No 15

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 26.43 812 455 357
56%
Shop 14.5 1 0 1
0%
Shop 14.65 1 0 1
0%
Shop 14.66 3 0 3
0%
Shop 14.92 1 0 1
0%
Shop 14.93 1 0 1
0%
Shop 14.96 1 0 1
0%
Shop 15.1 2 0 2
0%
Shop 21.07 1 0 1
0%
Shop 21.08 3 0 3
0%

Building No 16

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 26.43 632 12 620
2%
Shop 14.67 1 0 1
0%
Shop 15.06 1 0 1
0%
Shop 15.11 1 0 1
0%
Shop 15.16 1 0 1
0%
Shop 16.34 1 0 1
0%
Shop 19.66 1 0 1
0%
Shop 21.17 1 0 1
0%

Building No 17

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 26.32 927 0 927
0%
Shop 16.17 1 0 1
0%
Shop 16.19 1 0 1
0%
Shop 16.25 1 0 1
0%
Shop 16.67 2 0 2
0%
Shop 16.86 1 0 1
0%
Shop 16.92 1 0 1
0%
Shop 23.25 2 0 2
0%

Building No 18

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 26.32 632 632 0
100%
Shop 13.04 1 0 1
0%
Shop 14.0 1 0 1
0%
Shop 14.67 1 0 1
0%
Shop 14.93 1 0 1
0%
Shop 15.04 1 0 1
0%
Shop 15.14 1 0 1
0%
Shop 15.56 2 0 2
0%
Shop 15.57 2 0 2
0%
Shop 15.69 1 0 1
0%
Shop 15.81 1 0 1
0%
Shop 16.43 1 0 1
0%
Shop 16.66 3 0 3
0%
Shop 17.15 1 0 1
0%
Shop 17.88 1 0 1
0%
Shop 21.16 2 0 2
0%
Shop 23.24 4 0 4
0%

Building No 19

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 26.32 812 807 5
99%
Shop 14.5 1 0 1
0%
Shop 14.65 1 0 1
0%
Shop 14.66 3 0 3
0%
Shop 14.92 1 0 1
0%
Shop 14.93 1 0 1
0%
Shop 14.96 1 0 1
0%
Shop 15.1 2 0 2
0%
Shop 21.07 1 0 1
0%
Shop 21.08 3 0 3
0%

Building No 20

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 26.36 900 898 2
100%
Shop 14.11 5 0 5
0%
Shop 14.72 1 0 1
0%
Shop 14.97 1 0 1
0%
Shop 14.99 3 0 3
0%
Shop 15.18 1 0 1
0%
Shop 18.16 2 0 2
0%
Shop 20.93 3 0 3
0%
Shop 25.83 1 0 1
0%

Building No 8

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 26.43 632 0 632
0%
Shop 14.29 1 0 1
0%
Shop 15.56 2 0 2
0%
Shop 15.66 1 0 1
0%
Shop 15.74 1 0 1
0%
Shop 15.78 1 0 1
0%
Shop 16.36 1 0 1
0%
Shop 16.4 1 0 1
0%
Shop 16.41 1 0 1
0%
Shop 16.43 1 0 1
0%
Shop 16.65 3 0 3
0%
Shop 17.14 1 0 1
0%
Shop 20.9 1 0 1
0%
Shop 23.23 3 0 3
0%

Building No 9

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 26.32 812 282 530
35%

Construction Progress

Building No 10

Basement (if any)95%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Plinth95%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth95%
X number of Podiums0%
X number of Slabs of Super Structure0%

Building No 14

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure41%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure8%

Building No 15

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure41%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure8%

Building No 16

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure25%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure8%

Building No 17

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth95%
X number of Podiums0%
X number of Slabs of Super Structure0%

Building No 18

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure63%

Building No 19

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure75%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure25%

Building No 20

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure45%

Building No 8

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure20%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure5%

Building No 9

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure16%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure5%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.