📞 +91 98200 30685 ✉️
RERA: A51800043517

Thanekar Civic Phase II

by Thanekar Construction LLP Partnership
Certificate Signed P51700048038
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700048038
Registration No.
REA51700124831
Registration Date
2023-07-28
Developer
Thanekar Construction LLP Partnership
Architect
Raj Associates
Project Bank
IDBI BANK
Proposed Possession
2024-12-30
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Units Sold
0
Buildings
2
Project Area
4360.00 sq.m
Total FSI
13823.91
Approved FSI
13823.91
MahaRERA QR
Thanekar Civic Phase II
MahaRERA — P51700048038
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors13
Sanctioned13
🚗Open Parking10
🅿️Closed Parking30
📅Completion2024-12-30
🏗️Proposed Floors13
Sanctioned13
🚗Open Parking2
🅿️Closed Parking17
📅Completion2024-12-30

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1Bhk 29.719999313354492 0 0 0
0%
1Bhk 29.780000686645508 0 0 0
0%
1Bhk 29.950000762939453 0 0 0
0%
1Bhk 34.7400016784668 0 0 0
0%
1Bhk 35.91999816894531 0 0 0
0%
2Bhk 45.220001220703125 0 0 0
0%
2Bhk 45.369998931884766 0 0 0
0%
2Bhk 45.459999084472656 0 0 0
0%
2Bhk 46.25 0 0 0
0%
2Bhk 47.09000015258789 0 0 0
0%
2Bhk 47.11000061035156 0 0 0
0%
2Bhk 48.29999923706055 0 0 0
0%
2Bhk 50.25 0 0 0
0%
Shop 7.869999885559082 0 0 0
0%
Shop 7.880000114440918 0 0 0
0%
Shop 8.0600004196167 0 0 0
0%
Shop 10.3100004196167 0 0 0
0%
Shop 12.9399995803833 0 0 0
0%

A Wing Vistara

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 29.95 35 8 27
23%
1 BHK 35.92 24 15 9
62%
2 BHK 45.22 12 11 1
92%
2 BHK 45.46 24 13 11
54%
2 BHK 47.09 12 7 5
58%
2 BHK 47.11 12 5 7
42%
2 BHK 50.25 12 10 2
83%
Shop 7.87 5 4 1
80%
Shop 7.88 1 1 0
100%
Shop 8.06 4 4 0
100%
Shop 10.31 8 8 0
100%
Shop 12.94 2 2 0
100%

B Wing Eureka

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 29.72 23 18 5
78%
1 BHK 29.78 12 12 0
100%
1 BHK 34.74 48 10 38
21%
2 BHK 45.37 12 6 6
50%
2 BHK 46.25 12 4 8
33%
2 BHK 48.3 12 12 0
100%

Construction Progress

A Wing Vistara

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises30%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises20%
Sanitary Fittings within the flats / premises20%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.75%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

B Wing Eureka

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises10%
Overall Percentage of Completion of the work done For the entire Building /Wing40%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure65%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.25%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks25%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure65%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings 100%
Electrical Meter Room, Sub-Station, Receiving Station 100%
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains 60%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.