📞 +91 98200 30685✉️
RERA: A51800043517

Three Sixty West

by Oasis Realty Others
Certificate SignedP51900012115

Project Information

RERA Certificate No.
P51900012115
Registration No.
REA51900015851
Registration Date
2020-06-16
Developer
Oasis Realty Others
Architect
Wesymor Consultants Pvt. Ltd.
Project Bank
AXIS BANK
Proposed Possession
2021-06-30
Revised Possession
2021-06-30
Extended Possession
2022-06-30
Units Sold
0
Buildings
2
Project Area
6405.56 sq.m
Total FSI
149000.00
Approved FSI
119747.00
MahaRERA QR
Three Sixty West
MahaRERA — P51900012115
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors71
Sanctioned71
⬇️Basements4
🅿️Closed Parking168
📅Completion2020-12-31
🏗️Proposed Floors109
Sanctioned109
⬇️Basements4
🅿️Closed Parking936
📅Completion2020-12-31

Apartment Configurations

None

TypeCarpet (sq.ft)TotalBookedAvailableStatus
Penthouse1025.3199462890625000
0%
Type 11084.72998046875000
0%
Type 2817.47998046875000
0%
Z1 4Bed304.8599853515625000
0%
Z1 4Bed Terraceapt A304.8599853515625000
0%
Z1 4Bed Terraceapt B304.8599853515625000
0%
Z1 5Bed351.3599853515625000
0%
Z1 5Bed Terrace Apt351.3599853515625000
0%
Z1 Duplex A427.9800109863281000
0%
Z1 Duplex B428.45001220703125000
0%
Z1 Duplex C655.6599731445312000
0%
Z2 4Bed315.67999267578125000
0%
Z2 5Bed362.0400085449219000
0%
Z2 5Bed Type A465.6099853515625000
0%
Z2 5Bed Type B376.7300109863281000
0%
Z2 Duplex A450.4100036621094000
0%
Z2 Duplex B643.010009765625000
0%
Z2 Duplex C578.3599853515625000
0%
Z3 4Bed437.1400146484375000
0%
Z3 5Bed433.20001220703125000
0%
Z3 Duplex662.77001953125000
0%

Tower A

TypeCarpet (sq.ft)TotalBookedAvailableStatus
Type 11084.7324123
4%
Type 2817.48404
0%

Tower B

TypeCarpet (sq.ft)TotalBookedAvailableStatus
Penthouse1025.32202
0%
Z1 4Bed304.86461927
41%
Z1 4Bed TerraceApt A304.86101
0%
Z1 4Bed TerraceApt B304.86101
0%
Z1 5Bed351.36593821
64%
Z1 5Bed Terrace Apt351.36101
0%
Z1 Duplex A427.98633
50%
Z1 Duplex B428.45211
50%
Z1 Duplex C655.66202
0%
Z2 4Bed315.6832230
6%
Z2 5Bed362.0438731
18%
Z2 5Bed Type A465.61101
0%
Z2 5Bed Type B376.73101
0%
Z2 Duplex A450.41202
0%
Z2 Duplex B643.01101
0%
Z2 Duplex C578.36101
0%
Z3 4Bed437.1424024
0%
Z3 5Bed433.232032
0%
Z3 Duplex662.77404
0%

Construction Progress

Tower A

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.81%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate59%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.59%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises79%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises79%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing81%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Tower B

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.78%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate86%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.86%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises88%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises88%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure73%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.89%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks89%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing78%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure73%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings99%
Electrical Meter Room, Sub-Station, Receiving Station95%
Energy management70%
Fire Protection And Fire Safety Requirements95%
Landscaping & Tree Planting90%
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)87%
Solid Waste Management And Disposal75%
Storm Water Drains96%
Street Lighting90%
Tower A is proposed to comprise of upto 34 floors for Hotel users
Treatment And Disposal Of Sewage And Sullage Water90%
Water Conservation, Rain water Harvesting90%
Water Supply95%
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.