📞 +91 98200 30685✉️
RERA: A51800043517

Redevelopment Of Tiara Chsl

by Pranav Constructions Limited
Certificate SignedP51800034818

Project Information

RERA Certificate No.
P51800034818
Registration No.
REA51800106966
Registration Date
2023-08-28
Developer
Pranav Constructions Limited
Architect
Rasik P Hingoo And Associates
Project Bank
HDFC BANK
Proposed Possession
2024-10-04
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Units Sold
0
Buildings
1
Project Area
1562.60 sq.m
Total FSI
4198.12
Approved FSI
3627.22
MahaRERA QR
Redevelopment Of Tiara Chsl
MahaRERA — P51800034818
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors12
Sanctioned12
🚗Open Parking43
🅿️Closed Parking1
📅Completion2024-04-10

Apartment Configurations

Tiara

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK33.84110
100%
1 BHK37.56660
100%
1 BHK37.58110
100%
1 BHK37.82550
100%
2 BHK40.95110
100%
2 BHK41.2550
100%
2 BHK43.31110
100%
2 BHK43.34330
100%
2 BHK43.4220
100%
2 BHK43.67110
100%
2 BHK45.62110
100%
2 BHK46.31110
100%
2 BHK48.34110
100%
2 BHK48.7220
100%
2 BHK54.24220
100%
2 BHK54.28110
100%
2 BHK58.5710100
100%
2 BHK58.8610100
100%
2 BHK59.09440
100%
2 BHK59.33330
100%
2 BHK59.73330
100%
3 BHK75.72440
100%
3 BHK77.72220
100%
3 BHK85.58220
100%

None

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1Bhk33.84000015258789000
0%
1Bhk37.560001373291016000
0%
1Bhk37.58000183105469000
0%
1Bhk37.81999969482422000
0%
2Bhk40.95000076293945000
0%
2Bhk41.20000076293945000
0%
2Bhk43.310001373291016000
0%
2Bhk43.34000015258789000
0%
2Bhk43.400001525878906000
0%
2Bhk43.66999816894531000
0%
2Bhk45.619998931884766000
0%
2Bhk46.310001373291016000
0%
2Bhk48.34000015258789000
0%
2Bhk48.70000076293945000
0%
2Bhk54.2400016784668000
0%
2Bhk54.279998779296875000
0%
2Bhk58.56999969482422000
0%
2Bhk58.86000061035156000
0%
2Bhk59.09000015258789000
0%
2Bhk59.33000183105469000
0%
2Bhk59.72999954223633000
0%
3Bhk75.72000122070312000
0%
3Bhk77.72000122070312000
0%
3Bhk85.58000183105469000
0%

Construction Progress

TIARA

Basement (if any)100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Tiara

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space100%
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station100%
Energy management
Fire Protection And Fire Safety Requirements100%
Landscaping & Tree Planting100%
Open Parking100%
Sewerage (Chamber, Lines, Septic Tank , STP)100%
Solid Waste Management And Disposal
Storm Water Drains100%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting100%
Water Supply100%
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.