📞 +91 98200 30685 ✉️
RERA: A51800043517

Transcon Triumph Tower 4

by Transcon Triumph Phase 2 Private Limited Company
Certificate Signed P51800034924
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51800034924
Registration No.
REA51800106364
Registration Date
2022-04-28
Developer
Transcon Triumph Phase 2 Private Limited Company
Architect
Skyline Infrabuilt Consultants Pvt Ltd
Project Bank
HDFC BANK
Proposed Possession
2027-03-31
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Units Sold
0
Buildings
1
Project Area
640.10 sq.m
Total FSI
17130.00
Approved FSI
10332.00
MahaRERA QR
Transcon Triumph Tower 4
MahaRERA — P51800034924
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors40
Sanctioned40
🅿️Closed Parking219
📅Completion2027-03-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
2Bhk 61.220001220703125 0 0 0
0%
2Bhk 66.1500015258789 0 0 0
0%
2Bhk 69.48999786376953 0 0 0
0%
3Bhk 88.44999694824219 0 0 0
0%
3Bhk 95.77999877929688 0 0 0
0%

Transcon Triumph Tower 4

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 61.22 36 18 18
50%
2 BHK 66.15 14 0 14
0%
2 BHK 69.49 76 32 44
42%
3 BHK 88.45 1 0 1
0%
3 BHK 95.78 76 24 52
32%

Construction Progress

Transcon Triumph Tower 4

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Plinth100%
Podiums (if any) 80%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.15%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks15%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums80%
X number of Slabs of Super Structure0%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.