📞 +91 98200 30685 ✉️
RERA: A51800043517

Vaswani BelAir

by Brookefield Constructions Private Limited Company
Certificate Signed P51800045571
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51800045571
Registration No.
REA51800107783
Registration Date
2022-05-24
Developer
Brookefield Constructions Private Limited Company
Architect
Mr. Navin Vatnani
Project Bank
UNION BANK OF INDIA
Proposed Possession
2025-05-31
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Units Sold
0
Buildings
1
Project Area
796.80 sq.m
Total FSI
2363.02
Approved FSI
2363.02
MahaRERA QR
Vaswani BelAir
MahaRERA — P51800045571
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors15
Sanctioned15
🅿️Closed Parking41
📅Completion2025-05-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
2Bhk 67.44999694824219 0 0 0
0%
2Bhk 70.05000305175781 0 0 0
0%
3Bhk 115.94000244140625 0 0 0
0%
Add. Tenant Area 1.2999999523162842 0 0 0
0%
Add. Tenant Area 12.729999542236328 0 0 0
0%
Add. Tenant Area 14.210000038146973 0 0 0
0%
Add. Tenant Area 16.719999313354492 0 0 0
0%
Add. Tenant Area 19.510000228881836 0 0 0
0%
Add. Tenant Area 30.469999313354492 0 0 0
0%
Add. Tenant Area 31.770000457763672 0 0 0
0%
Add. Tenant Area 69.20999908447266 0 0 0
0%

Vaswani Belair

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 67.45 1 0 1
0%
2 BHK 70.05 5 5 0
100%
3 BHK 115.94 5 3 2
60%
Add. Tenant Area 1.3 1 1 0
100%
Add. Tenant Area 12.73 1 1 0
100%
Add. Tenant Area 14.21 1 1 0
100%
Add. Tenant Area 16.72 1 1 0
100%
Add. Tenant Area 19.51 1 1 0
100%
Add. Tenant Area 30.47 1 1 0
100%
Add. Tenant Area 31.77 2 2 0
100%
Add. Tenant Area 69.21 1 1 0
100%

Construction Progress

Vaswani BelAir

Basement (if any)100%

Vaswani Belair

Excavation100%

Vaswani BelAir

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%

Vaswani Belair

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate40%

Vaswani BelAir

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%

Vaswani Belair

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises90%
Overall Percentage of Completion of the work done For the entire Building /Wing84%

Vaswani BelAir

Plinth100%
Podiums (if any) 100%

Vaswani Belair

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises50%

Vaswani BelAir

Sanitary Fittings within the flats / premises50%
Slabs of Super Structure100%

Vaswani Belair

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.90%

Vaswani BelAir

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%

Vaswani Belair

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing70%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.