RERA Certificate No.
P51800002804
Registration No.
REA51800005887
Registration Date
2017-08-04
Developer
Veena Developers
Architect
Manish Shah
Project Bank
RBL Bank Limited
Proposed Possession
2019-12-31
Revised Possession
2019-12-31
Extended Possession
1900-01-01
Units Sold
0
Buildings
1
Project Area
239.71 sq.m
Total FSI
2705.16
Approved FSI
2705.16
MahaRERA QR
Veena Signature
MahaRERA — P51800002804
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors15
Sanctioned15
🚗Open Parking14
📅Completion2019-12-31

Apartment Configurations

Veena Signature

TypeCarpet (sq.ft)TotalBookedAvailableStatus
3 BHK96.6711110
9%
3 BHK98.111165
55%
3 BHK BIG110.09101
0%
3 BHK SMALL100.43101
0%
4 BHK137.38101
0%
COMMERCIAL 1 FLOOR215.71101
0%
COMMERCIAL GROUND183.4101
0%

None

TypeCarpet (sq.ft)TotalBookedAvailableStatus
3 Bhk96.66999816894531000
0%
3 Bhk Big110.08999633789062000
0%
3 Bhk Small100.43000030517578000
0%
3Bhk98.11000061035156000
0%
4 Bhk137.3800048828125000
0%
Commercial 1 Floor215.7100067138672000
0%
Commercial Ground183.39999389648438000
0%

Construction Progress

VEENA SIGNATURE

Basement (if any)100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises20%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%

Veena Signature

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate25%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises75%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises20%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.50%
Stilt Floor75%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing60%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station10%
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)35%
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.