📞 +91 98200 30685 ✉️
RERA: A51800043517

WINDSOR

by THE WINDSOR Others
Certificate Signed P51800011781
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51800011781
Registration No.
REA51800010101
Registration Date
2020-06-17
Developer
THE WINDSOR Others
Architect
Rs Javale
Project Bank
HDFC BANK
Proposed Possession
2020-12-30
Revised Possession
2020-12-30
Extended Possession
1900-01-01
Units Sold
0
Buildings
1
Project Area
846.20 sq.m
Total FSI
2284.68
Approved FSI
1511.32
MahaRERA QR
WINDSOR
MahaRERA — P51800011781
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors9
Sanctioned9
⬇️Basements1
🅿️Closed Parking29
📅Completion1900-01-01

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
2 Bed Liv Kit 73.18000030517578 0 0 0
0%
2 Bed Liv Kit 73.23999786376953 0 0 0
0%
3 Bed Liv Kit 99.80999755859375 0 0 0
0%
3 Bed Liv Study Kit 128.5800018310547 0 0 0
0%
4 Bed Liv Kit 119.75 0 0 0
0%

Windsor

Type Carpet (sq.ft) Total Booked Available Status
2 Bed Liv Kit 73.18 4 1 3
25%
2 Bed Liv Kit 73.24 5 1 4
20%
3 Bed Liv KIt 99.81 5 1 4
20%
3 Bed Liv Study Kit 128.58 1 1 0
100%
4 Bed Liv Kit 119.75 1 0 1
0%

Construction Progress

Windsor

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing70%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.