Project Information

RERA Certificate No.
P51800002437
Registration No.
REA51800011935
Registration Date
2017-08-01
Developer
Integrated Spaces Limited Company
Architect
Shri Yomesh N. Rao
Project Bank
IDBI BANK
Proposed Possession
2018-12-31
Revised Possession
2018-12-31
Extended Possession
2019-12-31
Units Sold
0
Buildings
1
Project Area
4338.10 sq.m
Total FSI
11810.00
Approved FSI
11810.00
MahaRERA QR
Integrated Kamal
MahaRERA — P51800002437
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors23
Sanctioned23
🚗Open Parking23
🅿️Closed Parking203
📅Completion2018-12-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1Bhk 39.439998626708984 0 0 0
0%
1Bhk 42.689998626708984 0 0 0
0%
1Bhk 43.20000076293945 0 0 0
0%
1Bhk 43.5099983215332 0 0 0
0%
2.5Bhk 63.02000045776367 0 0 0
0%
2.5Bhk 65.9000015258789 0 0 0
0%
2Bhk 51.97999954223633 0 0 0
0%
2Bhk 54.279998779296875 0 0 0
0%
2Bhk 54.84000015258789 0 0 0
0%
2Bhk 55.380001068115234 0 0 0
0%
2Bhk 55.540000915527344 0 0 0
0%
2Bhk 56.29999923706055 0 0 0
0%
2Bhk 56.41999816894531 0 0 0
0%
3Bhk 70.87999725341797 0 0 0
0%

Integrated Kamal

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 39.44 1 1 0
100%
1 BHK 42.69 15 12 3
80%
1 BHK 43.2 1 0 1
0%
1 BHK 43.51 12 8 4
67%
2 BHK 51.98 80 74 6
92%
2 BHK 54.28 15 11 4
73%
2 BHK 54.84 1 0 1
0%
2 BHK 55.38 17 17 0
100%
2 BHK 55.54 15 4 11
27%
2 BHK 56.3 1 1 0
100%
2 BHK 56.42 1 1 0
100%
2.5 BHK 63.02 26 23 3
88%
2.5 BHK 65.9 1 1 0
100%
3 BHK 70.88 12 12 0
100%

Construction Progress

INTEGRATED KAMAL

Basement (if any)100%

Integrated Kamal

Excavation100%

INTEGRATED KAMAL

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Integrated Kamal

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate97%

INTEGRATED KAMAL

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.97%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises99%

Integrated Kamal

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises99%
Overall Percentage of Completion of the work done For the entire Building /Wing99%

INTEGRATED KAMAL

Plinth100%
Podiums (if any) 100%

Integrated Kamal

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises96%

INTEGRATED KAMAL

Sanitary Fittings within the flats / premises96%
Slabs of Super Structure100%

Integrated Kamal

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.98%

INTEGRATED KAMAL

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks98%

Integrated Kamal

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station 100%
Energy management
Fire Protection And Fire Safety Requirements 100%
Landscaping & Tree Planting 100%
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP) 100%
Solid Waste Management And Disposal 100%
Storm Water Drains 100%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting 100%
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.